13.4 VENDOR MATERIAL INSPECTION PROCESS
13.4.1 SCOPE
Vendor material inspections are the responsibility of EPCM Contractor Procurement Department, which encompasses all EPCM Contractor purchased materials. Company is responsible for material inspection activities associated with Mill Pipe and Compressor orders.
EPCM Contractor will conduct surveillance and inspection of the vendor material to ensure adherence to codes, standards, specifications, and contractual requirements.
13.4.2 RESPONSIBILTY
The Project Manager and/or delegate shall make certain the agreed upon levels of inspection are met per the project and PO requirements. The Project Manager and/or delegate will ensure adequate planning and staff is devoted to the project as
…show more content…
Based on previous experience with the specific vendor and the PO’s scope, the EPCM Contractor discipline engineer will confirm the level of inspection he or she requires completed in writing. The specified level of inspection is not intended to relieve the manufacturer/vendor of any contractual responsibility in adhering to the design requirements or specifications as specified in the PO. Listed below are the different levels of inspection and the associated description of each: o V – Visual Inspection. An Inspector enters an area and/or facility for the purpose of a visual review of the progress of work, working environment, and safety conditions etc. Specific tasks in production may be monitored to determine the level of progress, workmanship, and quality. o O – Observation. An Inspector enters an area and/or facility for the purpose of observing the manufacturer perform its quality inspections as defined by requirements within the PO. o W – Witnessing. An Inspector enters an area and/or facility for the purpose of witnessing a specific task or set of tasks being performed on Goods during the manufacturing and/or assembly process. This is a scheduled visit based on the manufacturer’s progress and
Key outputs in this phase are the Projects Requirements definition, the capability and capacity assessment, project delivery strategy and the Project Management plan. The role of the construction/ project manager in this phase is, once project authorized, it is the project manager’s responsibility to implement the project. In terms of the Project Requirements Definition the, the project manager refines and details the project authorization and details what the project is required to accomplish in terms of the products/services the project will deliver and the scope of work that needs to be done. The project manager must provide project team members, corporate sponsors, and other stakeholders with a common understanding of what the project is all about, and is the authoritative reference document that defines the project.
They are responsible for monitoring HIM compliance program operation, educating HIM professionals, and conducting training activities for all staffs, including providers, clinical professionals, financial personnel, coders, and HIM staffs...They ensure that the compliance standards are deliver properly to all employees, especially HIM staffs, to prevent inappropriate manners in documentations and coding. They usually investigate and compare the payment that organizations receive based on the utilized codes to national trends to determine the dissimilarity. From that information, they could develop needed steps to address any issues. They often work with billing and clinical departments to examine the denial claims, which involve coding, to formulate plans that will avert the problems’ recurrence. HIM compliance specialists assure that entire organizations’ employees’ activities adhere to regulation standards. They will report and recommend actions for compliance breaching to compliance officers. Additionally, they are experts on ethical knowledge, so they are the sources for all staffs to obtain information about compliance manners (Healthcare compliance,
Part of your troop leading procedures. There are two types of inspections that u can conduct
For instance he will look to see that the contractor has delivered enough coating material to the work site so they can apply the system properly. He will check details around vents and up the edges to ensure the seals are up to specification. Building codes need to be met, and so
I prepared for the inspection by reviewing frequency of inspections made, observing the operations compliance history, the operations fee history, background check list and controlling person list, etc.
Relevant inspection is normally carried by persons that have a related filed within the inspection in which they will be inspecting.
Once the inspector arrives, necessary personnel should be notified according to official policy. The inspector should
For the safety of the equipment, the inspection date, the due date of the next inspection and the inspector’s initials must be tagged.
Sub-contractors are also responsible for all their own employees that they bring to complete the job and any tools that they bring with them. They must check that anyone that they employ to help with the job is competent and has the required training to complete the job. They must also make sure there is a toilet and washroom available for their employees. They must put something in place to stop members of the public accessing their place of work, this could be something like a fence. They must give clear instructions to everyone who is working on the job and work together with other sub-contractors who might also be working on the job. The last thing they are responsible for is making sure that the job is completed within the given timeframe. If not, they must inform the person they are working for in advance why the job will not be completed on
The way the Inspector operates may appear casual laid-back and spontaneous but he has only one objective and he uses his single-minded and calculating ways to get the results he wants. He likes to work systematically dealing with one person and one line of enquiry at a time; he confronts each of them with a piece of evidence before breaking them down and making them talk. Sheila understands this when she says “He’s giving us the rope – so that we’ll hang ourselves”.
The executive will also decide the funding of the project available , costs and cost tolerances for the project ,hold post project review of benefits identified in the business case, ensure that risks associated with the business case are identified and resolved, organise project board meetings and ensures that the project will be completed within its agreed tolerances
Oversees warranty and life-cycle of equipment. Coordinates the return of damaged and defective items covered by manufacturer. Researches and budgets for replenishment of consumables and worn equipment with the most practical and cost efficient replacement via internet, vendors and catalogs.
The auditor must obtain an understanding of the entity and its environment, including internal controls, so that they can identify and assess the risks of material misstatement on financial statements due to fraud or error and design and perform further audit procedures.
6.1 External quality assurance refers to the involvement of an external body or organisation outside of the company (Vroeijenstijn, 2007). Some examples of external quality assurance are the external auditing of financial statements and inspections by either governmental or industry authorities. A significant amount of external quality assurance is mandated by law, so legal concerns are important to take into consideration. When external bodies are charged with maintaining quality assurance, there can be significant penalties for non-compliance. A restaurant with poor sanitation can be shut down; a transportation company with a poor safety record can face penalties or license revocation. In some cases, the external quality body is linked to an organisation with the legal authority to punish offenders. This is the case with the SEC in America, for example, and accounting transgressions. There is usually an established legal basis for such external quality assurance (ENQA, 2009).
An inspection is a critical element that detects and responds to potential hazards. For example, the inspector ensures that the road signs are visible both day and night. In Minnesota, public safety department encourages the citizens to report any potential road hazards like potholes and damaged road signs.