preview

Assignment 1

Decent Essays

How did the team ensure that all requirements were met (to the extent that they were)? Our team along with the Mechanical Engineer team met with Dr. Foster every Tuesday after Senior Design to make sure we were meeting all the requirements for the Passing Trainer.
8
As well, we use microsoft project with a sharepoint site to track our progress on tasks and kept the site updated to reflect these changes. We also had team meetings as needed each week, and kept in contact as assignments were completed. Besides the EECS team meetings, we …show more content…

These requirements changed multiple times throughout the semester as we presented them to the customer until we settled on the current set.
On into the design phase we worked on researching solutions to problems we found the the previous team’s designs and worked to correct them to better meet the requirements. The code to run the passing trainer was scrapped, as it was just a rough outline of what they wanted to accomplish and not an actual implementation. This allowed us to redesign the controls for the passing trainer. This was also checked with Dr. Foster as we progressed week to week, and when we had to write the report to formalize the design decisions. This allowed for quick feedback and revisions, as well as verified each piece as we finished it.
Then in our implementation phase we are working closely with Dr. Foster to make sure the implementation of our design does not change the project too much. Luckily as the design of the controls’ hardware is chosen, we will have

Get Access