preview

The Goal Report

Good Essays

The book The Goal, written by Eliyahu M. Goldratt, is about the manufacturing process and how it works together to achieve the goals of a firm. The Goal is about science and education. It is an attempt to show that we can postulate a very small number of assumptions and utilize them to explain a very large spectrum of industrial phenomena. The Goal is about new global principles of manufacturing and people thinking logically and consistently about their problems and therefore able to determine “cause and effect” relationships between their actions and the results. In the process some of the characters in the book, Alex Rogo - who is the plant manager, Jonah - a physicist and old friend of Alex, Stacey Patazenik – who manages inventory …show more content…

Operating expenses includes production costs, such as direct labor, indirect labor, inventory carrying costs, equipment depreciation, materials and supplies used in production, and administrative cost. This was not happening at Alex’s plant. His inventories had increased over the past six or seven months and operational expense also increased. This meant he had a lot of work to do to keep his plant open and he was now aware of it. It takes a day out with the Boy Scots for Alex to discover one of his biggest problems at the plant – bottlenecks. A bottleneck is any resource whose capacity is less than the demand placed upon it and thus limiting the throughput. A nonbottleneck is a resource whose capacity is greater than the demand paced upon it and thus will contain idle time. A capacity constrained resource (CCR) is one whose utilization is close to capacity and could be a bottleneck if not scheduled carefully. Every production system needs some control point or points to control the flow of product through the system. If the system contains a bottleneck then the bottleneck is the best place for control. The control point is called the drum because it will strike the beat that the rest of the system uses to function. If there is no bottleneck, then the next best place to set the drum would be a capacity-constrained resource. If neither a bottleneck nor a capacity constrained resource is present, the control point can be

Get Access