A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant II gives similar $10 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants, How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?

Elementary Algebra
17th Edition
ISBN:9780998625713
Author:Lynn Marecek, MaryAnne Anthony-Smith
Publisher:Lynn Marecek, MaryAnne Anthony-Smith
Chapter5: Systems Of Linear Equations
Section5.2: Solve Systems Of Equations By Substitution
Problem 5.47TI: Geraldine has been offered positions by two insurance companies. The first company pays a salary of...
icon
Related questions
Question
A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It
costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $10 rebates. The
manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost?
How
many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints?
The number of engines to send to plant Lis
The number of engines to send to plant II is
www
Transcribed Image Text:A manufacturing company receives orders for engines from two assembly plants. Plant I needs at least 45 engines, and plant Il needs at least 32 engines. The company can send at most 140 engines to these assembly plants. It costs $30 per engine to ship to plant I and $40 per engine to ship to plant II. Plant I gives the manufacturing company $20 in rebates toward its products for each engine they buy, while plant Il gives similar $10 rebates. The manufacturer estimates that they need at least $1500 in rebates to cover products they plan to buy from the two plants. How many engines should be shipped to each plant to minimize shipping costs? What is the minimum cost? How many engines should be shipped to each plant to minimize shipping costs, subject to the given constraints? The number of engines to send to plant Lis The number of engines to send to plant II is www
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 5 steps with 3 images

Blurred answer
Recommended textbooks for you
Elementary Algebra
Elementary Algebra
Algebra
ISBN:
9780998625713
Author:
Lynn Marecek, MaryAnne Anthony-Smith
Publisher:
OpenStax - Rice University
Intermediate Algebra
Intermediate Algebra
Algebra
ISBN:
9780998625720
Author:
Lynn Marecek
Publisher:
OpenStax College
Algebra: Structure And Method, Book 1
Algebra: Structure And Method, Book 1
Algebra
ISBN:
9780395977224
Author:
Richard G. Brown, Mary P. Dolciani, Robert H. Sorgenfrey, William L. Cole
Publisher:
McDougal Littell