An office supplies retailer orders staplers (among other products) from the manufacturer. The annual demand for staplers has been estimated to be 250 units per month. The holding cost per unit per year has been estimated to be 1.20 $. The ordering cost is estimated to be $ 50 per order. Determine the following:
Q: CASE 2. "The Possibility"Restaurant Angela Fox and Zooey Caulfield were food and nutrition majors at…
A:
Q: If Julia clears at least $1,000 in profit for each game after paying all her expenses, she believes…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: you are the manager of a group of 10 staff within the firm you work for. Your staff have shown to be…
A: As a manager, you have some responsibility for your employees' motivation and well-being. All…
Q: A linear programming computer package is needed. of a of customers make reservations via phone.…
A: Given data is Day Minimum employees needed Monday 75 Tuesday 55 Wednesday 50 Thursday 70…
Q: 2-1. Use the graphical method to find the solution to the linear programming problems: - Min. Z =…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: What would a manager do if they noticed they received a damaged product after they signed the…
A: Shipping claims are important to be understood by both, the buyer and the vendor. Because for…
Q: As a manager, do you think it's important to break down a project into manageable chunks? Is there a…
A: Project decomposition can be stated as the approach of dividing the elements or components of any…
Q: A firm wants to determine how many units of each of two products: Wall clock and Alarm clock, they…
A: The question is related to linear programming. The given problem is of maximization.
Q: You are a consultant who has been engaged to advise an organization on the development of an MIS…
A: A MIS (management information system) strategy is a guide/blueprint for the development of the…
Q: 2. Describe Webvan's supply chain design in detail. Contrast Webvan's supply chain with that of a…
A: Webvan’s Supply chain: Webvan’s supply chain operations has begun on 1999 and now it…
Q: 3. A machine cell uses 200 pounds of a certain material each day. Material is transported in vats…
A: Let, d =200 pounds k= 20 pounds per container y = 0.08 c=2 hours Now, Time,…
Q: GENERATE THE DECISION VARIABLE SOLUTION AND GENERATE A SENSITIVITY REPORT 1. Southern Sporting Goods…
A: Let, B = Units of basketball to be produced F = Units of Football to be produced Objective…
Q: Consider the following tables of the ALPHA Inc. project. Complete the table with necessary data -…
A: Completing the entire table will lead to a greater work area and difficult to put the screenshots in…
Q: When starting a project, what is the first thing you do? I'd want to see a few examples of this.
A: Organizing a project means structuring a project. Structuring means managing, coordinating, and…
Q: If the coefficient for Activity 2 in the objective function changes to $400, then the objective…
A: The allowable increase of activity 2 is 500. This means that the objective coefficient of activity 2…
Q: The manager of a Burger Doodle franchise wants to determine how many sausage biscuits and ham…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: What are the characteristics of an ERP?
A: An enterprise resource planning system is a software application that is used to automate the…
Q: What exactly is an evaluation plan?
A: As the roadmaps are used to facilitate the progress in the journey, same as the evaluation plan…
Q: Forecast February by: Arithmetic Average Weighted moving average, weights are 8 and 2. Which method…
A: Forecasting can be stated as the technique of anticipating or predicting the upcoming time or future…
Q: Determine the optimal Q and TC given the following information: D = 30,000 boxes ● Ch = $2 Co = $300…
A: Given data: Annual demand(D) = 30,000 units Ordering cost(S) = $300 Holding cost(H) = $2
Q: of a descriptive mod
A: descriptive model
Q: The manager of a Burger Doodle franchise wants to determine how many sausage biscuits and ham…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: (a) What is an estimate of the proportion defective when the process is in control? (b) What is the…
A: Control charts are also known as process-behavior charts. It is a statistical process that helps in…
Q: CASE 3. Burger Doodle The manager of a Burger Doodle franchise wants to determine how many sausage…
A: Given data is Biscuit Labor(hr) Sausage(lb) Ham(lb) Flour(lb) Sausage 0.010 0.10 - 0.04 Ham…
Q: CASE 2. “The Possibility"Restaurant Angela Fox and Zooey Caulfield were food and nutrition majors at…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: que? Explain with examples?
A: The Fourth Industrial Revolution (4IR) portrayed by the combination of the computerized, organic,…
Q: From several years’ records, a fish market manager has determined that the weight of deep sea bream…
A: The z-score is used to measure the statistical significance of a data point. The z-score is…
Q: 2. Two suppliers of products are available to supply the needs of four supermarkets. Each supplier…
A: Find the Given details below: Given details: From To Super Market A Super Market B Super…
Q: ACME Company is a big supplier that wants to make it difficult for new suppliers to take sales away…
A: Given data: Demand (D) =10,000/year Price =$ 75.75 /unit Ordering cost (S) = $320 per order…
Q: This exercise only contains parts b, c, d, e, and f. b) Given the demand, the cycle time for the…
A:
Q: Explain the global challenges in Supply Chain Management and relate with the facts given in the case…
A: Costs Throughout the Supply Chain Profit margins are under pressure as costs creep up throughout the…
Q: Scenario: Information technology is a powerful force in shaping service strategies. Customers of an…
A: In service process redesign, the major four objectives are as follows. 1. Reduce service errors 2.…
Q: Product M is made of 2 units of N and 3 unit of P. N is made of 2 units of R and 4 units of S. R is…
A: BOM or Bills of material or Product structure tree lists the components and sub-components and their…
Q: In personal selling and sales management inputs and outputs are not always same- Explain why? Please…
A: Personal selling is also known as face-to-face selling in which one person who is the salesman tries…
Q: Provide the following: labor productivity of Old and New System (shopping cart per dollar of labor)…
A: Productivity is the relationship between the volume of the input and output that is calculated in…
Q: which of these is not true about DMADV options are Addresses the to-be process Reduces/…
A: DMADV is nothing but the acronym for Define, Measure, Analyze, Design, and Verify. DMADV is…
Q: Help Lizzy decide which of her friends should rent which equipment, and how much it will cost. Lizzy…
A: An assignment problem is a technique to find the combinations of the optimal solution to the…
Q: Which employee should be assigned to Job 1 Job 2 Job 3 What is the minimum cost to complete all the…
A: An assignment problem is a technique to find the combinations of the optimal solution to the…
Q: To get things started, why is it essential for young professionals like students, interns, and…
A: Operation management is an important part of management where the manager is responsible for…
Q: c Golf Cart c golf cart Time on Hand 1 0 10
A: Given: Parts List for Electric Golf Cart Lead Time Quantity on Hand Electric golf cart 1 0…
Q: w does these com
A: During the process of lean manufacturing, waste may come from a number of different sources.…
Q: Hello! So what is the maximum daily profit obtainable for Prime Paints in the manufacture of these…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: A company faces the following demands during the next three weeks: week 1, 2000 units; week 2, 1000…
A: Demand: Week 1: 2000 units Week 2: 1000 units Week 3: 1500 units Production cost per unit: Week 1:…
Q: (a) Formulate a linear programme to determine an investment plan that will maximize the the total…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Discuss five (5) challenges in setting goals
A: Organizations like Summerwood Hotel today are focused upon delivering the best commodities to their…
Q: What is total quality management?
A: The term "total quality management" was first used in the 1960s to describe a manufacturing…
Q: Using the maximax decision criterion, what dvice can you give about quantities of yogurt to buy for…
A: Mathematic models of decision-making help businesses take the correct decision for their operational…
Q: Analyze the nature and importance of Marketing Logistics and Supply Channel Management.
A: Distinguish between marketing logistics and integrated supply chain management and explain the…
Q: CASE 3. Burger Doodle The manager of a Burger Doodle franchise wants to determine how many sausage…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: J. Z. Smith is a small consulting firm specializing in implementing new information systems…
A: In this instance, everything is proceeding according to plan. Their clients are content. The issue…
Time interval between consecuitive order placements ( assume 300 working days)
Step by step
Solved in 2 steps with 2 images
- Thompson Paint Company uses 60,000 gallons of pigment per year. The cost of ordering pigment is $200 per order, and the cost of carrying the pigment in inventory is $1 per gallon per year. The firm uses pigment at a constant rate every day throughout the year. a. Calculate the EOQ. b. If it takes 20 days to receive an order once it has been placed, determine the reorder point in terms of gallons of pigment. (Note: Use a 365-day year.)Golden Crust Bakery buys flour in 25-pound bags. The bakery uses an average of 1,215 bags ayear. Preparing an order and receiving a shipment of flour involves a cost of $10 per order.Annual holding costs are $75 per bag. Once an order for flour is placed, it takes six (6) days toreceive the order from the flour factory. The bakery operates 350 days per year.Calculate the following:(i) Economic Order Quantity(ii) Expected number of orders (Order Frequency)(iii) Average inventory(iv) The annual holding cost(v) The annual ordering cost(vi) The total annual cost of inventory management(vii) Reorder point(viii) If holding costs were to increase by $9 per year, how much would thataffect the minimum total annual cost?Stationery Supplies orders plastic erasers from a company in Nürnberg, Germany.It takes six weeks to ship the erasers from Germany to Utah. Stationery Suppliesmaintains a standing order of 200 erasers every six months (shipped on the first ofJanuary and the first of July).a. Assuming the ordering policy the store is using does not result in large buildupsof inventory or long-term stock-outs, what is the annual demand for erasers?b. Draw a graph of the pipeline inventory (that is, the inventory ordered but notreceived) of the erasers during one year. What is the average pipeline inventoryof erasers during the year?
- I need answers A company uses on an average 216 parts a day with a standard deviation of 16 parts per day in a manufacturing process. Cost of placing and receiving an ordering is BDT 40,000. Estimated monthly carrying cost is BDT 90 per part. Orders are delivered approximately 7 days after being placed. The delivery time is normal with a mean of 7 days and a standard deviation of 2 days. The company is open 360 days per year. Find the order quantity that is economical. If the Company takes 3% stock out risk, then find safety stock (SS) quantity and Re-Order Point? 3.If the supplier offers a discount of BDT 8 per circuit board for purchasing of 4000 boards at a time, then financially evaluate and justify whether the company will go with the offer or not? 4.The person who orders the boards follows this rule: Order when the amount on…Question 1 For supply item ABC, Andrews Company has been ordering 400 units per week. A new purchasing agent has been hired by the company who wants to start using the economic-order- quantity method and its supporting decision elements. She has gathered the following information: Annual demand in units Lead time, in days Ordering costs Insurance and handling costs Purchase price per unit Return on cash investment 20,800 5 $22 $7 $15 15% RequiredKabel Market store sells electric cable. The demand for cable is normally distributed. The inventory related information at Kabel Market is as follows: Average Annual Demand = 16,900 meters Standard deviation of weekly demand = 28 meters Cable selling price = AMD 640.00 per meter Ordering cost = AMD 1,250.00 per order Lead time = 5 weeks Annual inventory-holding cost estimate = 2.5% of the cable selling price Required service level = 95% Kabel Market works 52 weeks a year. Note: The approximate z values are: for 0.9 ≈ 1.28, for 0.92 ≈ 1.405, for 0.95 ≈ 1.645, for 0.98 ≈ 2.05. Suppose the bar management practices the fixed-QUANTITY ordering system with the use of the economic order quantity. Answer the following questions: (i) How many meters of cable they order from the supplier each time? (ii) When do they place an order? (iii) What is the safety stock?
- Define each of the following in your own words and as a formula:a. Annual ordering cost.b. Annual carrying cost.c. Total annual cost.Bakery A sells bread for $2 per loaf that costs $0.50 per loaf to make. Bakery A gives an 80% discount for its bread at the end of the day. Based on the critical ratio determined, the company would expect the stockout rate to be % (use the normal distribution table posted on Canvas and round to two decimal places)A sports fan store sells hats. The following are associated characteristics for hats Annual Demand 16000 units Ordering costs $26 Holding costs $4 per unit/year **round all your answers to the nearest whole number a) The EOQ for the hats is b) The annual holding costs for the hats at the EOQ are c) The annual ordering costs for the hats at the EOQ are 2. Antique manufactures old-fashioned telephones for use in movie scenes (and other displays). Antique's annual demand for rotary telephones is 33,000 units per year, so it needs just as many receptors to assemble the phones. Receptors are ordered from a supplier, and shipping and handling costs are $15 per order (regardless of how many units are on order). The holding costs are $7/unit/year. If the current company policy calls for orders of 3,000 receptors, what are the total annual inventory costs for the receptors? round your final answer to the nearest whole dollar.
- The figure on the right shows the inventory levels cherries (in pounds) at one store and the order-reorder periods over 1 year. Refer to the figure to answer the following questions. 180 (a) What is the average amount of cherries in inventory during one order-reorder period? (b) What is the maximum amount of cherries in inventory during one order-reorder period? (c) How many orders were placed during the year? (d) How many pounds of cherries were sold during the year? 1st order arrives End of year (a) What is the average amount of cherries in inventory during one order-reorder period? The average amount of cherries in inventory during one order-reorder period is pounds.A company operates for 50 weeks a year and uses a fixed quantity inventory system for one of its most important items. Below are the characteristics for the item: Weekly demand follows normal distribution: mean of 400 units and standard deviation of 100 units Order Cost = $40 per order Annual Holding cost = $2/unit/year Desired service level = 95% (z = 1.645) Lead Time = 4 weeks Economic Order Quantity (EOO) = 894 units Now suppose that the management is considering switching to a fixed time inventory system where the time between orders is 2 weeks. Everything else being the same as the information provided for the original problem, which system (Q or P system) is likely to have more safety stock? Please explain why.EOQ, reorder point, and safety stock Alexis Company uses 916 units of a product per year on a continuous basis. The product has a fixed cost of $60 per order, and its carrying cost is $3 per unit per year. It takes 5 days to receive a shipment after an order is placed, and the firm wishes to hold 10 days' usage in inventory as a safety stock. a. Calculate the EOQ. b. Determine the average level of inventory. (Note: Use a 365-day year to calculate daily usage.) c. Determine the reorder point. d. Indicate which of the following variables change if the firm does not hold the safety stock: (1) order cost, (2) carrying cost, (3) total inventory cost, (4) reorder point, (5) economic order quantity. a. Alexis' EOQ is units. (Round to the nearest whole number.)