Consider a rural drainage 24-acre basin having soil group D with good hydrologic condition to be used for the construct of a channel. The land delineation in the basin is 1/2 meadows, 1/4 brush, and 1/4 pasture. If the time of concentration is 0.3-hrs, with a design rainfall of 4.5 in for type-Il distribution, determine the peak flow for this basin for the design of the channel. Insert your graphs.

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter16: Highway Drainage
Section: Chapter Questions
Problem 10P
icon
Related questions
Question

hydrology. 

Consider a rural drainage 24-acre basin having soil group D with good hydrologic condition to be used for
the construct of a channel. The land delineation in the basin is 1/2 meadows, 1/4 brush, and 1/4 pasture.
If the time of concentration is 0.3-hrs, with a design rainfall of 4.5 in for type-Il distribution, determine the
peak flow for this basin for the design of the channel. Insert your graphs.
Transcribed Image Text:Consider a rural drainage 24-acre basin having soil group D with good hydrologic condition to be used for the construct of a channel. The land delineation in the basin is 1/2 meadows, 1/4 brush, and 1/4 pasture. If the time of concentration is 0.3-hrs, with a design rainfall of 4.5 in for type-Il distribution, determine the peak flow for this basin for the design of the channel. Insert your graphs.
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Engineering standards and codes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning