ASSIGNMENT INSTRUCTION A Pavement Management System (PMS) is a set of tools or methods that can assist decision in finding cost effective strategies for providing, evaluating, and maintaining a road bridge in good serviceable condition that provide a variety of facilities for users. Straddling the service, these enabling users to enjoy the facilities offered at each bound of the roadway as to view the traffic below. Based on Pavement Management System tools, conduct the study to investigate the roadway bridge or walkway bridge across the road included the planning strategies, design of construction and the problem may be observed and analysis of benefits over cost ratio. Please discuss with your lecturer regarding the area of study. With 2 persons per group, write and prepare the report according to the Pavement Management System with more discuss on the function of a roadway bridge, pedestrian or walkway bridge across the road and effect on traffic flow. The report must be prepared included the picture and please write a detail explanation and the necessary analysis. The report will be evaluated according to the following assessments: Introduction/Background :10 Explanation in detail problem : 30 Detail Methodology to solve the problem : 25 Discussion : 20 Conclusion : 10 References : 5 Total :100

Traffic and Highway Engineering
5th Edition
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Garber, Nicholas J.
Chapter19: Design Of Flexible Highway Pavements
Section: Chapter Questions
Problem 7P
icon
Related questions
Question
ASSIGNMENT INSTRUCTION
A Pavement Management System (PMS) is a set of tools or methods that can assist decision in
finding cost effective strategies for providing, evaluating, and maintaining a road bridge in good
serviceable condition that provide a variety of facilities for users. Straddling the service, these
enabling users to enjoy the facilities offered at each bound of the roadway as to view the traffic
below. Based on Pavement Management System tools, conduct the study to investigate the
roadway bridge or walkway bridge across the road included the planning strategies, design of
construction and the problem may be observed and analysis of benefits over cost ratio. Please
discuss with your lecturer regarding the area of study.
With 2 persons per group, write and prepare the report according to the Pavement Management
System with more discuss on the function of a roadway bridge, pedestrian or walkway bridge
across the road and effect on traffic flow. The report must be prepared included the picture and
please write a detail explanation and the necessary analysis.
The report will be evaluated according to the following assessments:
Introduction/Background
:10
Explanation in detail problem
: 30
Detail Methodology to solve the problem : 25
Discussion
: 20
Conclusion
: 10
References
: 5
Total
:100
Transcribed Image Text:ASSIGNMENT INSTRUCTION A Pavement Management System (PMS) is a set of tools or methods that can assist decision in finding cost effective strategies for providing, evaluating, and maintaining a road bridge in good serviceable condition that provide a variety of facilities for users. Straddling the service, these enabling users to enjoy the facilities offered at each bound of the roadway as to view the traffic below. Based on Pavement Management System tools, conduct the study to investigate the roadway bridge or walkway bridge across the road included the planning strategies, design of construction and the problem may be observed and analysis of benefits over cost ratio. Please discuss with your lecturer regarding the area of study. With 2 persons per group, write and prepare the report according to the Pavement Management System with more discuss on the function of a roadway bridge, pedestrian or walkway bridge across the road and effect on traffic flow. The report must be prepared included the picture and please write a detail explanation and the necessary analysis. The report will be evaluated according to the following assessments: Introduction/Background :10 Explanation in detail problem : 30 Detail Methodology to solve the problem : 25 Discussion : 20 Conclusion : 10 References : 5 Total :100
Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning