Backhoe excavator worked for 45 hours to excavate and stock the required earth volume to be loaded by a payloader to a fleet of 5-dump trucks, which haul the earth to site where it is compacted on a shrinkage factor of 20%. Each truck has a total cycle time of 15 minutes, assuming it does not have to wait in line to be loaded. The earth has a percent swell of 25%. The job requires a compacted volume of 30,000 m 3 done by a road grader, roller compactor and water tanker in 70 hours. Calculate the direct equipment total cost spent considering the following? a. Payloader capacity – 220 m 3 (bank volume) of common earth per hour. b. Dump trucks capacity – 20 m 3 (loose volume) each unit c. Payloader rental rate – ₱650/hour d. Dump truck rental rate – ₱180/hour e. Backhoe rental rate – ₱800/hour f. Road grader rental rate = ₱ 550/hr g. Roller compactor rental rate – ₱750/hour h. Water tanker rental rate – ₱ 120/hr

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question

Backhoe excavator worked for 45 hours to excavate and stock the required earth volume to be loaded by a
payloader to a fleet of 5-dump trucks, which haul the earth to site where it is compacted on a shrinkage factor
of 20%. Each truck has a total cycle time of 15 minutes, assuming it does not have to wait in line to be loaded.
The earth has a percent swell of 25%. The job requires a compacted volume of 30,000 m 3 done by a road grader,
roller compactor and water tanker in 70 hours. Calculate the direct equipment total cost spent considering the
following?

a. Payloader capacity – 220 m 3 (bank volume) of common earth per hour.
b. Dump trucks capacity – 20 m 3 (loose volume) each unit
c. Payloader rental rate – ₱650/hour
d. Dump truck rental rate – ₱180/hour
e. Backhoe rental rate – ₱800/hour
f. Road grader rental rate = ₱ 550/hr
g. Roller compactor rental rate – ₱750/hour
h. Water tanker rental rate – ₱ 120/hr

Expert Solution
steps

Step by step

Solved in 2 steps

Blurred answer
Knowledge Booster
Methods to determine productivity
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning