Consider the following crash data for a project. Times are given in weeks. ACTIVITY A B C What will be the cost of activity E if it is completed in 3 weeks? The cost will be $ D E F How many week(s) of crashing are available for activity E in the table above? Activity E has weeks of crashing available. NORMAL TIME 4 7 8 3 7 6 CRASH TIME 4 5 3 1 1 3 NORMAL COST ($) 1,400 5,000 5,700 2,400 1,100 2,800 CRASH COST ($) 1,400 6,200 8,700 3,800 5,900 5,200
Q: Why are Supply Chain strategy and planning are critical for any company. Many companies have not…
A: Supply chain management is the maintenance and flow of all those actives which are involved in…
Q: Calculate the total annual inventory cost (excluding the purchase cost)
A: The total annual inventory cost (TAC) is the sum of all the costs associated with inventory. The TAC…
Q: Project's standard deviation is the square root of the variance. Write a formula in cell F48 to…
A: z-score = (target days-expected duration)/project standard deviation Probability is taken…
Q: Mr. Henry produces a particular type of shoes on a Fancy line. The process involves eight different…
A:
Q: i. Using trend projection, develop a formula to predict sales for years 11 and 12. You have to show…
A: The linear trend equation is a formula used to calculate the slope and intercept of a linear trend y…
Q: Based on the x-chart, is one or more samples beyond the control limits? Yes No
A: Control limits for x-bar chart: UCL = 4.86LCL = 4.52 Control limits for R chart: UCL = 1.344LCL =…
Q: Using the following, forecast the sales for the months up to January the following year:- A simple…
A: The mean absolute deviation (MAD) is a measure of the accuracy of forecasts. It measures how far off…
Q: In order to assess a suppliers’ pool, you decide to evaluate the following categories of the…
A: Find the Calculation methods below: Given details: Category Target score Actual performance…
Q: Audi Profile, History and Status Quo: In 1910, the first Audi car was produced in Zwickau, Saxony.…
A: The case is about an automobile manufacturer that produces luxurious cars. The company follows a…
Q: a) What is the ROP to satisfy a %90 probability of not stocking out? b) What is the safety stock? c)…
A: Daily demand (d) = 100 Standard deviation demand (Sd) = 12 Lead time (L) = 5 Standard deviation (Sl)…
Q: To From A Select one: 6 O 8 a. Unbalanced b. Unbounded 2 Demand 400 200 The solution presented in…
A: A transpiration cost matrix will helps to identify the optimal allocation for costs based on the…
Q: Using trend projection, develop a formula to predict sales for years 11 and 12. You have to show all…
A: Trend projection forecast technique is a technique that is used to predict the future of a trend. It…
Q: An appliance store sells microwaves at a steady rate throughout the year. Each microwave costs the…
A:
Q: If the annual demand is 14,000, the number of working days is 330 in a year, and the delivery lead…
A: As per guideline, expert can only solve first question ' s sub part. So please upload remaining part…
Q: a smoothing constant of 0.2, what is the forecast for next year? The initial forecast (for 5 years…
A: Formulae used: Ft =Ft-1 + α (At-1)-(Ft-1)Where, Ft =Forecast for period tFt-1 = Forecast for prior…
Q: Activity A B C D E F G I J K L Immediate Predecessors none none A, B AABCFFFHIK C, D, E H, I Time…
A: We prepare the project network diagram in Excel as shown below: The above diagram is prepared using…
Q: Why is a Sales forecast and Sales Budget so important to the Supply Chain process?
A: Forecasting is a technique used to predict future outcomes on the basis of past data. In businesses…
Q: Problem 3: Write the MOST equation for the task and calculate the Normal time for the process (in…
A: MOST (Maynard operation sequence technique) is the time and motion study technique used in…
Q: ending inventory
A: Gross Profit Margin = 55% Beginning Inventory = 142,000 Net Purchases = 202,000 Net Sales = 433,000
Q: Forecasting method A has errors of 10, -15, 5 and 20. Forecasting method B has errors of -10, 4, 16…
A: Forecasting is a method of predicting the unknown. In other words, it is a step forward by looking…
Q: 2. You've decided to buy used books at the end of the Fall semester to sell to spring students.…
A: Given data: Selling cost = $30 Cost price= $15 Demand 0 25 50 75 100 Probability 0 0.40 0.20…
Q: Study the scenario provided below and answer all questions that follow. InSight Limited imports…
A: Given data: Ordering cost per order=5000Carrying cost per unit per year=2Current Order…
Q: A firm has established a distribution network for the supply of a raw material critical to its…
A: When supply is less than demand or vice versa, it is called as unbalanced problem. For unbalanced…
Q: for materials. b. Discuss any three factors that will help to determine the type of production…
A: Process technology refers to the tools, machinery, and apparatus used in the production and/or…
Q: # search any Examples for LPP to help you understanding the Linear programming problem Formulation
A: In this question, let me provide an example of an LPP or Linear programming problem, here, I have…
Q: Forecasting as you have read isn't an exact science. There can be many intangibles that you just…
A: Forecasting: This is a scientific process of providing an estimate of a data value in the future…
Q: Bill's Barbershop has two barbers available to cut customers' hair. Both barbers provide roughly the…
A: Process capacity can be identified by calculating the bottleneck capacity of the process. The…
Q: Why International Supply Chains are much more complex than simple domestic supply chains? List four…
A: International Supply are more complex than domestic supply chains because the risks of domestic…
Q: Increase the amount of special sauce available by 1 ounce and re-solve. Does the solution confirm…
A: We reproduce the Excel as shown below: We solve the problem using Excel Solver as shown in the…
Q: Which type of network optimization problem is used to solve this problem?
A: The network optimization problem is a mathematical problem that is trying to find the least cost of…
Q: Part e & f is incorrect e.)Ls=3.125+0.75=3.875 ships f.) Lq=(6^2(1/6)^2+0.75^2)/2(1-.75)=3.125…
A: Given that: Arrival rate (A) 6 Service rate (S) 8 number of servers C 1
Q: Compute and tabulate the daily demand for each month in the table below (round off to the nearest…
A: Note: We are allowed to do one question only. Daily demand is the demand per day. Daily demand =…
Q: Given the following historical data, what is the moving-average forecast for period 6 based on the…
A: A moving average is a method for determining the general trend in a data set. The data set used in…
Q: a) The EOQ for the workbooks is 444 (round your response to the nearest whole number). b) What are…
A: The best order amount of raw materials for a corporate organization to reduce holding costs, order…
Q: A pharmaceutical company producing vitamin capsules desires a proportion of calcium content between…
A: Find the given details below: Given details: Upper Specification Limit (USL) 55 Lower…
Q: Question 2 Read the case study below and answer the following questions: Colgate-Palmolive Supply…
A: Supply chain: Supply chain is defined as there is a chain between from raw material…
Q: ) Max Z = 2X1 + 3X2 Sub to X1 + 2X2 ≥ 50 10X1 + 20X2 ≤ 175 And X1, X2 ≥ 0 (SOLVE MANUALLY…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Need help please show formula how to solve please. Thanks A newly formed company must decide on a…
A: Choosing the best location based on the expected profit is the most suitable solution for given…
Q: The wheat harvesting season in the American Midwest is short, and farmers deliver their truckloads…
A: From the given question description, the following information is extracted. Arrival rate λ = 31…
Q: Jill's Job Shop buys two parts (Tegdiws and Widgets) for use in its production system from two…
A: ITEM TEGDIW WIDGET Annual demand 11000 8000 Holding cost (% of item cost) 10% 20% Setup or…
Q: Discuss why many modern organizations adopt a just-in-time philosophy for their manufacturing…
A: Just-in-time is a kind of inventory system where the company or the buyer makes an order only when…
Q: What is your forecast for next year's sales? (Do not round intermediate calculations and round your…
A: The least squares method of forecasting is based on the principle that the sum of squared errors…
Q: How does companies use business case to select projects
A: Business Case for projects To determine whether an investment is profitable, a business case must be…
Q: Explain the use of a flowchart in operational design.
A: Operational design is the detailed design for the organizational operations, and is helpful for the…
Q: In your own words, describe cost of quality (COQ) and why an organization should be managing COQ.
A: Today the business world is becoming ever more competitive day by day. The client has a broad range…
Q: terested in arriving at a forecast of rentals so that she can order the correct quantities of…
A: Ans) Formula:
Q: The following table shows the number of televisions sold over the last ten years at a local…
A: First lets calculate some additional values to insert them in the formula: Assume Year = X and TV…
Q: Given that we are on Day 30 and the following data, what task should receive the highest priority?…
A: Critical ratio is the proportion between total time remaining and total job remaining. Considering…
Q: Questions 1.Explain using illustrations how forecasting features in this company's operations.…
A: Forecasting is a technique to predict future value. It is useful to predict future demand, sales, or…
Q: Explain when you think a baseline should be updated and why.
A: A project baseline is a saved version of your project's initial schedule that can be used to compare…
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- Using your results from Problem 6,(a) Calculate the probability that the project will be completedin 38 weeks.(b) Calculate the probability that the project will be completedin 42 weeksCreate a risk matrix for this project:Event Cost ($000) ProbabilityEquipment breakdown 40 .20Vendor is late with key segment 200 .60Subcontractor has labor issues 140 .30Weather problems 15 UnknownFunding delays 50 .40 to .60Testing delays 20 .40Explain your reasoning for your placement of the events Weather problems and Funding delays.What is the minimum cost of crashing the following project that Roger Solano manages at Slippery Rock University by 4 days? Normal Cost $800 $200 $600 $750 $1,200 Normal Crash Activity Time (days) Time (days) 4 3 8 6 The total cost of crashing the project by 4 days is $ ABCDE 487 355 (Enter your response as a whole number.) Total Cost with Crashing Immediate Predecessor(s) $1,500 $1,650 By how many days should each activity be crashed to reduce the project completion time by 4 days? Fill in the table below. (Enter your responses as whole numbers.) Each Activity Should be Reduced BY (days) Activity A B C D E $1,100 $600 $650 A C
- Th e dean of the business school wants to start off eringthis program starting 32 weeks from now. Using the informationprovided in Problem 15,(a) Calculate the probability of the program starting ontime.(b) If the dean needs a 95 percent probability of being doneon time, how long can the expected project duration be?Assume we are planning to develop a room reservation system that is estimated to have 400 story points of features. Let’s say our team’s velocity on two-week sprints ranges between 20 and 25 story points. Our project will start on Dec 1, 2021. If our customer wants the project to be in production by end of June 22, how likely will the project be successful? Why? Show your calculations.The following information has been computed from aproject:Expected total project time = T = 62 weeksProject variance (s2p ) = 81What is the probability that the project will be completed18 weeks before its expected completion date?
- The following information relates to a project (task times are in weeks). Use the information to solve for the critical path and then to determine the probability that the project could be completed within 36 weeks. Task A B C D E F Preceding Tasks to 4 4 2 None A B D, E tm 6 7 7 8 13 9 8 0 W CON 6 tp 8 10 12 18 15 10 Click the icon to view the table of standard normal probabilities. The probability that the project is completed within 36 weeks is. (Enter your response rounded to four decimal places.)We are planning to develop a room reservation system that is estimated to have 400 story points of features. Let’s say our team’s velocity on two-week sprints ranges between 20 and 25 story points. Our project will start on Dec 1, 2021. If our customer wants the project to be in production by end of June 22, how likely will the project be successful? Why? Show your calculations.You are the project manager of the software installationproject in Table 7.12. You would like to find the minimum-costschedule for your project. There is a $1,000-per-week penaltyfor each week the project is delayed beyond week 25. In addi-tion, your project team determined that indirect project costsare $2,500 per week.a. What would be your target completion week?b. How much would you save in total project costs with yourschedule?
- A project consists of five activities as shown in the following table. Activity Floor sanding Floor buffing Paint mixing Wall painting Ceiling painting Optimistic Time (hr) Most Probable Time (hr) 4 4 0.5 2 3 5 5 Сл 1 3 7.5 Pessimistic Time (hr) 6 6 1.5 10 9 Naturally, the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. (a) Construct the PERT/CPM network for this problem.B/U pe Activity A B D 11. A project has the activity duration and cost information indicated in the table where all times are in weeks. There is a penalty of $4,000 per week for every week the project exceeds 37 weeks. What is the lowest total cost for completing this project? Predecessor Time 18 11 A A B C E D Normal A H 12 15 3 19 Asbe de ABC' AMBBC RACE AB 7 8 12 6 Normal Cost Crash Time Crash Cost $22,000 $32,000 $62,000 $18,000 $35,000 $8,000 $23,000 $32,000 $56,000 $12,000 5 $18,000 19 $22,000 $9,000 $15,000 $5,000 $13,000 $20,000 $45,000 2 5 4What is the minimum cost of crashing the following project that Roger Solano manages at Slippery Rock University by 4 days? Normal Crash Time Activity Time (days) (days) AB А C D E 67555 5 BCD w 55 с 4 2 Activity A E 3 Normal Cost $800 $300 $600 $750 $1,200 Immediate Total Cost with Crashing Predecessor(s) $1,100 $500 By how many days should each activity be crashed to reduce the project completion time by 4 days? Fill in the table below. (Enter your responses as whole numbers.) $650 $1,500 $1,650 - Each Activity Should be Reduced BY (days) A C