Earth is required to be excavated from borrow pits for building an embankment as shown in the figure below. The moisture unit weight of the borrow pits is 18 kN/m³ and its water content is 8%. Estimate the quantity of earth required to be excavated per meter length of embankment. The dry unit weight required for the embankment is 15 kN/m³ with a moisture content of 10%. Assume the specific gravity of solids as 2.67. Also determine the degree of saturation of the embankment soil and the volume of water in the embankment. (hint: Volume of emankment per meter length) 2mL

Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Braja M. Das, Khaled Sobhan
Chapter7: Permeability
Section: Chapter Questions
Problem 7.22P: Refer to Figure 7.24. The following data were collected during the field permeability measurement of...
icon
Related questions
Question
Earth is required to be excavated from borrow pits for building an embankment as
shown in the figure below. The moisture unit weight of the borrow pits is 18 kN/m³
and its water content is 8%. Estimate the quantity of earth required to be excavated
per meter length of embankment. The dry unit weight required for the embankment
is 15 kN/m³ with a moisture content of 10%. Assume the specific gravity of solids
as 2.67. Also determine the degree of saturation of the embankment soil and the
volume of water in the embankment. (hint: Volume of emankment per meter length)
|--2m-
4 m
Embankment
Transcribed Image Text:Earth is required to be excavated from borrow pits for building an embankment as shown in the figure below. The moisture unit weight of the borrow pits is 18 kN/m³ and its water content is 8%. Estimate the quantity of earth required to be excavated per meter length of embankment. The dry unit weight required for the embankment is 15 kN/m³ with a moisture content of 10%. Assume the specific gravity of solids as 2.67. Also determine the degree of saturation of the embankment soil and the volume of water in the embankment. (hint: Volume of emankment per meter length) |--2m- 4 m Embankment
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
Principles of Seepage
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Geotechnical Engineering (MindTap C…
Principles of Geotechnical Engineering (MindTap C…
Civil Engineering
ISBN:
9781305970939
Author:
Braja M. Das, Khaled Sobhan
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781305081550
Author:
Braja M. Das
Publisher:
Cengage Learning
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning