Generator 1 G Bus 1 Line 1 Load 1 Bus 2 The information of the system is presented as follows: Generator data: Line 3 Line 2 Bus 3 G Generator 2 Load 2 Line 4 G Bus 4 Load 3 Generator 3 • Generator 1 is located at Bus 1, its maximum capacity is 300 MW, and its cost is $22/MW. Generator 2 is located at Bus 3, its maximum capacity is 300 MW, and its cost is $35/MW. • • Generator 3 is located at Bus 4, its maximum capacity is 300 MW, and its cost is $53/MW. Transmission line data: Line 1 is from Bus 1 to Bus 2, its capacity is 500 MW, and its reactance is 0.1 per unit. • Line 2 is from Bus 1 to Bus 4, its capacity is 176 MW, and its reactance is 0.08 per unit. • Line 3 is from Bus 2 to Bus 3, its capacity is 500 MW, and its reactance is 0.1 per unit. Line 4 is from Bus 3 to Bus 4, its capacity is 500 MW, and its reactance is 0.1 per unit. Load data: • Load 1 is at Bus 2, and it is 123 MW. • Load 2 is at Bus 3, and it is 200 MW. • Load 3 is at Bus 4, and it is 300 MW. The MVA base value is 100 MVA, the big M is 1000. Only a maximum of 1 line can be switched out. What is the total cost of generation for the system in dollars? (Please just enter the number. No need to enter the unit.)
Generator 1 G Bus 1 Line 1 Load 1 Bus 2 The information of the system is presented as follows: Generator data: Line 3 Line 2 Bus 3 G Generator 2 Load 2 Line 4 G Bus 4 Load 3 Generator 3 • Generator 1 is located at Bus 1, its maximum capacity is 300 MW, and its cost is $22/MW. Generator 2 is located at Bus 3, its maximum capacity is 300 MW, and its cost is $35/MW. • • Generator 3 is located at Bus 4, its maximum capacity is 300 MW, and its cost is $53/MW. Transmission line data: Line 1 is from Bus 1 to Bus 2, its capacity is 500 MW, and its reactance is 0.1 per unit. • Line 2 is from Bus 1 to Bus 4, its capacity is 176 MW, and its reactance is 0.08 per unit. • Line 3 is from Bus 2 to Bus 3, its capacity is 500 MW, and its reactance is 0.1 per unit. Line 4 is from Bus 3 to Bus 4, its capacity is 500 MW, and its reactance is 0.1 per unit. Load data: • Load 1 is at Bus 2, and it is 123 MW. • Load 2 is at Bus 3, and it is 200 MW. • Load 3 is at Bus 4, and it is 300 MW. The MVA base value is 100 MVA, the big M is 1000. Only a maximum of 1 line can be switched out. What is the total cost of generation for the system in dollars? (Please just enter the number. No need to enter the unit.)
Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter3: Power Transformers
Section: Chapter Questions
Problem 3.45P: Figure 3.39 shows a oneline diagram of a system in which the three-phase generator is rated 300 MVA,...
Related questions
Question
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning