In the graphical analysis of a linear programming model,what occurs when the slope of the objective function is thesame as the slope of one of the constraint equations?
Q: The standard form of the following linear programming model is given. Find the values of variables…
A:
Q: GulfOil Company (GOC) can buy two types of crude oil: light oil at $49/barrel and heavy oil…
A: Given data is
Q: Consider the following linear programming problem: Maximize 12X + 10Y Subject to:…
A: Below is the solution:-
Q: Oya Optim, the business analyst, can invest up to $15,000 in stocks and loans. Each dollar invested…
A: Note: - As we can answer only up to three subparts we will answer the first three subparts here. If…
Q: A farmer has 5 hectares of land to plant with rice and corn. He needs to decide how many hectares of…
A: THE ANSWER IS AS BELOW:
Q: An oil company produces oil from two wells. Well 1 can produce up to 150,000 barrels per day, and…
A:
Q: A university has three professors who each teach four courses per year. Each year, four sections of…
A: A Small Introduction about Production Management Production management alludes to the method…
Q: The Copperfield Mining Company owns two mines, which produce three grades of ore: high, medium, and…
A: Objective Functions and Constraints: Based on the given details, we found the…
Q: (a) Formulate this as a linear program. (b) Find a good or optimal integer solution using branch and…
A: Below is the solution:-
Q: A business student at Nowledge College must complete a total of 65 courses to graduate. The number…
A: a. Let # of business courses = x # of non-business course = y Then we can formulate this problem as…
Q: A farmer in the Midwest has 1,000 acres of land on which she intends to plant corn, wheat, and…
A: Goal programming is a part of multiobjective streamlining, which thusly is a part of the multi-rules…
Q: TRUE OR FALSE An optimal solution to a linear programming problem always occurs at the intersection…
A: An optimal solution to a linear programming problem is the feasible solution with the largest…
Q: What happens when the slope of the objective function is the same as the slope of one of the…
A: But only if there are fewer than 2 variables is it possible to perform a graphical analysis with…
Q: Formulate this as a linear program. Find a good or optimal integer solution for part by rounding off…
A:
Q: A gourmet coffee distributor has on hand 17, 600oz of African coffee, 21,120oz of Brazilian coffee,…
A: Given Information: Based on the given information, the linear programming problem can be…
Q: suppose a linear programming (maximation) problem has been solved and that the optimal value of the…
A: This might affect the optimal value of the objective function as follows
Q: Muir Manufacturing produces two popular grades of commercial carpeting among its many other…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: A food wholesaler has three kinds of individual bags of potato chips: regular, barbeque, and salt…
A: Simplex method is one of the most used techniques in linear programming. A problem can be solved…
Q: There are three factories on Momiss River. Each emits two types of pollutants, labeled P1 and P2,…
A: Factors in LP models are accepted to display proportionality. Proportionality manages the commitment…
Q: In graphical linear programming, when the objective function is parallel to one of the binding…
A: The concept of Operation Management: Operation management is the management that applies to a…
Q: Muir Manufacturing produces two popular grades of commercial carpeting among its many other…
A: Given information:Each roll of grade X carpet uses synthetic fiber is=50unitsProduction time of…
Q: Which of the following are the main parts of a linear programming? maximization and minimization…
A: Linear programming is a mathematical approach for determining the best feasible result or solution…
Q: Formulate a goal programming model to determine the number of acres of each crop the farmer should…
A: Assume that,x acres for corny acres for wheatz acres for soyabeans.The profit…
Q: An Electrical Utility Startup Problem A problem faced by an electrical utility company each day is…
A: Let us consider the variables A, B, C,D & E represent the Generators A,B,C,D & E. Now, let…
Q: Muir Manufacturing produces two popular grades of commercial carpeting among its many other…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: pleqse solve the question 2 here using the information in question 1
A: as per your instruction, we are solving the second question. given,
Q: Consider a Linear Programming (LP) problem with 6 basic feasible solutions including a unique…
A: Linear Programming manages the issue of enhancing a linear target work subject to linear uniformity…
Q: onstraint in Linear Programming
A: Finding the production levels that provide the most profit while also incurring the least expense is…
Q: The Livewright Medical Supplies Company has a total of 12 salespeople it wants to assign to three…
A: Below is the solution:-
Q: A recent college graduate is planning to move cross country from her college town to the city where…
A: An integer programming programme is an optimization or feasibility programme with some or all of the…
Q: GulfOil Company (GOC) can buy two types of crude oil: light oil at $49/barrel and heavy oil…
A: Part (A): Decision Variable: Suppose-X1= Barrels of light oil to purchaseX2= Barrels of heavy oil…
Q: Formulate a linear programming model for Mossaic Tiles, Ltd., and determine the mix of tiles it…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: In a metropolitan area, 45,000 people want to travel from the city suburbs to the city center. To do…
A: As per the given question details, x1 = Number of people drive to travel from city suburbs to the…
Q: create a set of linear equations to describe the objective function and the constraints. b. use…
A: Let, Number of business courses = x Number of non-business courses = y The linear equation can be…
Q: You have solved a 3-variable maximisation Linear Program with the objective function of z = 4x1 +…
A: Objective function: Maximize Z = 4x1+3x2+7x3 x1 = 7 x2 = 0 x3 = 0 Optimal value of Z =…
Q: For the following problem, what would be the constraint that limits the capacity of Machine 1…
A: Given: The total capacity for Machine1 as mentioned = 500 hr. It takes 2hr, 3hr, 4hr,& 2hr for…
Q: A company manufactures two types of trucks. Each truck must go through the painting shop and the…
A: Product layout requires specialized supervision in order to make sure everything is functioning…
Q: Muir Manufacturing produces two popular grades of commercial carpeting among its many other…
A: 1. Given that Muir Company must determine how many rolls of each grade of carpet it should produce…
Q: ABC Company manufactures beds and cabinets. Both are processed through assembly and finishing…
A: The question is related to the maximization problem of Linear programming. Linear programming, often…
Q: A company makes two products, X and Y, using two machines, 1 and 2. Each unit of X that is produced…
A:
Q: A farmer in the Midwest has 1,000 acres of land on which she intends to plant corn, wheat, and…
A: Given information, Cost of Corn = $100 Profit = $30 Cost of Soyabean = $70 Profit = $20 Cost of…
Q: A company makes two types of sofas, regular and long, at two locations, one in Msamvu and one in…
A: Below is the solution:-
Q: sources—rubber and leather. The resource requirements for each product and the total resources…
A: formulating a linear programming:
Q: Under what circumstances is the objective function more important than the constraints in a linear…
A: Constraints are less important than objective functions:
Q: A food wholesaler has three kinds of individual bags of potato chips: regular, barbeque, and salt…
A: Objective Functions and Constraints: Based on the given details, the objective…
Q: An electronics discount chain has a sale on a certain brand of 60-in. high-definition television…
A: Let x1 be the number of TV sets to be shipped from the warehouse of long Beach to Santa Monica. x2…
Q: A company manufactures two products, X and Y by using three machines A, B, and C. Machine A has 4…
A: Given Information:
Q: The Livewright Medical Supplies Company has a total of 12 salespeople it wants to assign to three…
A:
In the graphical analysis of a linear programming model,
what occurs when the slope of the objective function is the
same as the slope of one of the constraint equations?
Trending now
This is a popular solution!
Step by step
Solved in 2 steps
- Lemingtons is trying to determine how many Jean Hudson dresses to order for the spring season. Demand for the dresses is assumed to follow a normal distribution with mean 400 and standard deviation 100. The contract between Jean Hudson and Lemingtons works as follows. At the beginning of the season, Lemingtons reserves x units of capacity. Lemingtons must take delivery for at least 0.8x dresses and can, if desired, take delivery on up to x dresses. Each dress sells for 160 and Hudson charges 50 per dress. If Lemingtons does not take delivery on all x dresses, it owes Hudson a 5 penalty for each unit of reserved capacity that is unused. For example, if Lemingtons orders 450 dresses and demand is for 400 dresses, Lemingtons will receive 400 dresses and owe Jean 400(50) + 50(5). How many units of capacity should Lemingtons reserve to maximize its expected profit?Seas Beginning sells clothing by mail order. An important question is when to strike a customer from the companys mailing list. At present, the company strikes a customer from its mailing list if a customer fails to order from six consecutive catalogs. The company wants to know whether striking a customer from its list after a customer fails to order from four consecutive catalogs results in a higher profit per customer. The following data are available: If a customer placed an order the last time she received a catalog, then there is a 20% chance she will order from the next catalog. If a customer last placed an order one catalog ago, there is a 16% chance she will order from the next catalog she receives. If a customer last placed an order two catalogs ago, there is a 12% chance she will order from the next catalog she receives. If a customer last placed an order three catalogs ago, there is an 8% chance she will order from the next catalog she receives. If a customer last placed an order four catalogs ago, there is a 4% chance she will order from the next catalog she receives. If a customer last placed an order five catalogs ago, there is a 2% chance she will order from the next catalog she receives. It costs 2 to send a catalog, and the average profit per order is 30. Assume a customer has just placed an order. To maximize expected profit per customer, would Seas Beginning make more money canceling such a customer after six nonorders or four nonorders?What is the algebraic formulation for this question, including objective function and constraints
- Long-Life Insurance has developed a linear model that it uses to determine the amount of term life Insurance a family of four should have, based on the current age of the head of the household. The equation is: y=150 -0.10x where y= Insurance needed ($000) x = Current age of head of household b. Use the equation to determine the amount of term life Insurance to recommend for a family of four of the head of the household is 40 years old. (Round your answer to 2 decimal places.) Amount of term life insurance thousandsMark Sumansky owns and manages the Grass, Unlimited, Lawn-care service in Middleton. His customers include individual homeowners and businesses that subscribe to his service for lawn care beginning in the spring and ending in the fall with leaf raking and disposal. Thus, when he begins his service in April he generally has a full list of customers and does not take on additional customers any time after the first of June, it is difficult to find new customers, since most people make lawn service arrangements forth the entire summer. Mark employs five crews, with three to five workers each, to cut grass during the spring and summer months. A crew normally works 10-hour days and can average cutting about 25 normal-size lawns of less than a half-acre each day. A crew will normally have one heavy-duty, wide-cut riding mower, a regular power mower, and trimming equipment. When a crew descends on a lawn, the normal procedure is for one person to mow the main part of the lawn with the riding…In problems involving maximization and minimization, what is the objective function? States intended outcome in equation form Incorporates constraint of maximum budget Lists set of potential restrictions on the solution Cites constraints to ensure objectivity
- The Centurion apartment building in downtown Chicago has a total of 240 rental units. It offers its new tenants an 18-month lease, which is renewed on a month-to-month basis if the tenant chooses to stay longer than 18 months. The leasing office reports that The Centurion signs about 80 leases with new tenants in an average year, and that 60% of tenants who move in end up staying in the building longer than 18 months. On average, the building is 90% occupied. You may assume that a negligible number of tenants break their lease in the first 18 months. What is the average length of stay (in months) for those tenants who stay longer than 18 months (counted from when they first sign their original lease)?What function does linear programming play in OR?Facility Location. A paper products manufacturer has enough capital to build and manage some additional manufacturing plants in the United States in order to meet increased demand in three cities: New York City, NY; Los Angeles, CA; and Topeka, KS. The company is considering building in Denver, CO; Seattle, WA; and St. Louis, MO. Max Operating Capacity 400 tons/day 700 tons/day Denver Seattle $10/ton $17/tor $5/ton $11/ton.... $18/ton.... $28/ton Los Angeles Topeka New York City Figure 1: Graphical representation of the given data = • The cost fi of building plants in these cities is fi $10,000,000 in Seattle. Unmet Demand 300 tons/day 100 tons/day 500 tons/day • Due to geographic constraints, plants in Denver and Seattle would have a maximum operating capacity kį of 400 tons/day and 700 tons/day respectively. $5,000,000 in Denver and f2 = • The cost cij per ton of transporting paper from city i to city j is outlined in Figure 1. • The unmet demand d, for Los Angeles, Topeka, and New…
- A college student works in both the school cafeteria and library. She works no more than 12 hours per week at the cafeteria, and no more than 16 hours per week at the library. She must work at least 20 hours each week. Write a system of inequalities that describes all the given conditions. Write a system of inequalities letting x= number of hours worked at the cafeteria per week and y = number of hours worked at the library per week. x+yz x≤ ysLinear Programming is a special and versatile technique which can be applied to a variety of management problems viz. True or FallsRVW (Restored Volkswagens) buys 15 used VW's at each of two car auctions each week held at different locations. It then transports the cars to repair shops it contracts with. When they are restored to RVW's specifications, RVW sells 10 to each of three different used car lots. There are various costs associated with the average purchase and transportation prices from each auction to each repair shop. Also there are costs associated with average repair expenses and transportation costs from the repair shops to the used car lots. RVW is concerned with minimizing its total cost. Given the costs below, determine a minimum total cost schedule for RVW. Repair Shops Used Car Lots si S2 L1 L2 L3 Auction 1 550 500 s1 250 300 500 Auction 2 600 450 S2 350 650 450