Solar PV systems have large potential to produce large amounts of electricity in desert regions such as in Oman. It is proposed to build a very large solar PV system in the Al Sharqiya Desert to supply all of Oman's electricity nee which is about 28 x 109 kW-hr per year. If the average annual solar insolation in the Al Sharqiya Desert is 2400 kW-hr/m² per year, and assuming a solar ce efficiency of 20% and a system efficiency of 65%, А. What total PV area is required? В. If Al Sharqiya Desert has an area of 1.25 x 1010 m², what percentage of the desert will have to be covered with solar PV?

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.31P: Consider two interconnected voltage sources connected by a line of impedance Z=jX, as shown in...
icon
Related questions
Question
Solar PV systems have large potential to produce large amounts of electricity in desert regions such as in Oman.
It is proposed to build a very large solar PV system in the Al Sharqiya Desert to supply all of Oman's electricity needs
which is about 28 x 10° kW-hr per year.
If the average annual solar insolation in the Al Sharqiya Desert is 2400 kW-hr/m² per year, and assuming a solar cell
efficiency of 20% and a system efficiency of 65%,
А.
What total PV area is required?
В.
If Al Sharqiya Desert has an area of 1.25 x 1010 m², what percentage of the desert will have to be covered with
solar PV?
Transcribed Image Text:Solar PV systems have large potential to produce large amounts of electricity in desert regions such as in Oman. It is proposed to build a very large solar PV system in the Al Sharqiya Desert to supply all of Oman's electricity needs which is about 28 x 10° kW-hr per year. If the average annual solar insolation in the Al Sharqiya Desert is 2400 kW-hr/m² per year, and assuming a solar cell efficiency of 20% and a system efficiency of 65%, А. What total PV area is required? В. If Al Sharqiya Desert has an area of 1.25 x 1010 m², what percentage of the desert will have to be covered with solar PV?
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Solar cell
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning