The analyst in the Dorben Company wishes to assign a number of like facilities to an operator based on minimizing the cost per unit of output. A detailed study of the facilities revealed the following:   Loading machine standard time = 0.30 minutes Unloading machine standard time = 0.25 minutes Walk time between two machines = 0.09 minutes Operator rate = $12.00 per hour Machine rate (both idle and working) = $18.00 per hour Machine cycle time = 1.55 minutes TEC = The Expected Cost a) With your initial estimation, how many machines can be serviced exactly?(please keep a non-integer with three decimal places) b) How much is your TEC per piece if the operator has idle time? (please keep three decimal places) c)How much is your TEC per piece if the machine has idle time?  (please keep three decimal places) d) How many of these machines should be assigned to each operator?(please write down a numerical number)

Automotive Technology: A Systems Approach (MindTap Course List)
6th Edition
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Jack Erjavec, Rob Thompson
Chapter22: Basics Of Electronics And Computer Systems
Section: Chapter Questions
Problem 4RQ: Means that data concerning the effects of the computers commands are fed back to the computer as an...
icon
Related questions
Question

The analyst in the Dorben Company wishes to assign a number of like facilities to an

operator based on minimizing the cost per unit of output. A detailed study of the facilities

revealed the following:

 

Loading machine standard time = 0.30 minutes

Unloading machine standard time = 0.25 minutes

Walk time between two machines = 0.09 minutes

Operator rate = $12.00 per hour

Machine rate (both idle and working) = $18.00 per hour

Machine cycle time = 1.55 minutes

TEC = The Expected Cost

  1. a) With your initial estimation, how many machines can be serviced exactly?(please keep a non-integer with three decimal places)
  2. b) How much is your TEC per piece if the operator has idle time? (please keep three decimal places)

c)How much is your TEC per piece if the machine has idle time?  (please keep three decimal places)

  1. d) How many of these machines should be assigned to each operator?(please write down a numerical number)
The analyst in the Dorben Company wishes to assign a number of like facilities to an
operator based on minimizing the cost per unit of output. A detailed study of the facilities
revealed the following:
Loading machine standard time = 0.30 minutes
Unloading machine standard time = 0.25 minutes
Walk time between two machines = 0.09 minutes
Operator rate = $12.00 per hour
Machine rate (both idle and working) = $18.00 per hour
Machine cycle time = 1.55 minutes
a) with your initial estimation, how many machines can be serviced exactly?
with three decimal places)
b) How much is your TEC if the operator has idle time? $
c) How much is your TEC if the machine has idle time? $
(please keep a non-integer
per piece (please keep three decimal places)
d) How many of these machines should be assigned to each operator?
per piece (please keep three decimal places)
(please write down a numerical number)
Transcribed Image Text:The analyst in the Dorben Company wishes to assign a number of like facilities to an operator based on minimizing the cost per unit of output. A detailed study of the facilities revealed the following: Loading machine standard time = 0.30 minutes Unloading machine standard time = 0.25 minutes Walk time between two machines = 0.09 minutes Operator rate = $12.00 per hour Machine rate (both idle and working) = $18.00 per hour Machine cycle time = 1.55 minutes a) with your initial estimation, how many machines can be serviced exactly? with three decimal places) b) How much is your TEC if the operator has idle time? $ c) How much is your TEC if the machine has idle time? $ (please keep a non-integer per piece (please keep three decimal places) d) How many of these machines should be assigned to each operator? per piece (please keep three decimal places) (please write down a numerical number)
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Automation of Manufacturing Processes
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Automotive Technology: A Systems Approach (MindTa…
Automotive Technology: A Systems Approach (MindTa…
Mechanical Engineering
ISBN:
9781133612315
Author:
Jack Erjavec, Rob Thompson
Publisher:
Cengage Learning
Refrigeration and Air Conditioning Technology (Mi…
Refrigeration and Air Conditioning Technology (Mi…
Mechanical Engineering
ISBN:
9781305578296
Author:
John Tomczyk, Eugene Silberstein, Bill Whitman, Bill Johnson
Publisher:
Cengage Learning