what resources are the primary target of "resource management"
Q: Stack parameters: Height = 75.0 m Diameter = 1.50 m Exit velocity = 12.0 m/s Temperature = 322°C Atm...
A:
Q: 2. Seismic Velocity Given the geophone data below, calculate the seismic wave velocity in each layer...
A: Prob 4: Step 1: Seismic velocity = distance/time V1= 10/8 = 1.25 ft/msec V2= 1.428 ft/msec V3= 1.25 ...
Q: PROBLEM 3 GIVEN: Parameters 14 in 28 in 84 kips 187 kips REQUIRED: The force-couple system shown act...
A:
Q: In your engineering survey course, your instructor put you in a group to help a transportation engin...
A:
Q: Consider the compound beam with segmentsAB and BCD joined by a pin connection(moment release) just r...
A: Given data:
Q: half-submerged in a tank of oil with a specific gravity of 0.82. Find the minimum weight of an ancho...
A:
Q: A curved line in a level surface all points of which are normal to the direction of gravity and equi...
A: To Determine Which of the given term is correct for the definition given.
Q: The 30-mm-diameter A-36 steel rod is subjected to the axial forces shown. Take E = 200 GPa. (Figure ...
A:
Q: Solve for the horizontal components of the force at pin B (See the Figure below). 3' 6' 5' 3' A 8' E...
A: To determine the horizontal component of reaction at B. In order to determine the reaction at pin ...
Q: A tensile load of 190 kN is applied to a round metal bar with a diameter of 16 mm and a gage length ...
A: Given: Tensile load=190 kN =190000N dia of bar=16mm ...
Q: Determine the Skempton's pore pressure parameter 'A' using the following values given in table below...
A: Given data, determine skemptom pore water pressure
Q: Given a compound curve I1=24 deg, I2=36 deg, D1=6 deg, D2=4 deg., Stationing PC is at 6+029.21. Com...
A: Given- I1=24o D1=6o I2=36o D1=4o Stationing PC is at 6+029.21
Q: 2: A ship is 200 m long. What is the range delay extent seen by a radar?
A:
Q: coarse aggregate with a nominal maximum size of 2 inches and dry rodded density of 110 lb/ft3 will b...
A: Given, Is a mix design for preparing concrete, wherein The coarse aggregate is having Nominal max s...
Q: truck makes a 14 trips per day. Calculate job TMPH for truck.
A: TMPH: - It stands ton mile per hour. It is used to analyze job done by vehicle like truck.
Q: 1. Determine the value of M1 if the system shown is equivalent to a single force acting at point C. ...
A:
Q: A tie bar 50 mm x 8 mm is to carry a load of 80 kN. A specimen of same quality steel of cross-sectio...
A: Given- Tie bar=50 mm×8 mmLoad=80 kNArea=250 mm2Maximum load=125 kN
Q: A saturated compressible clay layer of thickness h is sandwiched between two sand layers, as shown i...
A: Given-Thickness of clay layer=hpore water pressure, u=25 kPavertical stress,σ=150 kPaadditional vert...
Q: For a given section of road, relationship between speed and density is obtained as u = 53 – 0.43 k, ...
A:
Q: link traverse has been conducted between two temporary benchmarks of known elevation and includes an...
A: Step 1: BS IS FS Rise Fall RL 2.325 52.716 1.139 1...
Q: What is the application of Statistics in Civil Engineering? Give examples and Provide a thorough dis...
A: Statistics is a science that helps us make decisions and draw conclusions in the presence of variabi...
Q: b = 331 E = 186 KN.m. M = 6.5 KN.m. 420mm 1. Calculate the maximum tensile and compressive strength....
A:
Q: A steel tube is rigidly attached between an aluminum rod and a bronze rod as shown. The maximum P va...
A:
Q: A noise meter located at a distance of 30 m from a point source recorded 74 dB. The reading at a dis...
A: Given, Sound recorded at 1st location: L1 = 74dB Sound recorded at 2nd location: L2 = ?? Distance of...
Q: Verify the adequacy of W18x50 beam with a simple span of 10.00m Due to architectural limitations, th...
A: given data A W18x50 beam with a simple span of 10.00m dead load = 6.50 KN/m live load=10. 90KN/m F...
Q: Calculate the amount of soil that need to be excavated for wall footing that has a depth of (h). Foo...
A: Que:- Calculate the amount of soil that needs to be excavated for wall footing that has a depth of (...
Q: You were then told that the whole structure will be left exposed and unprotected from all sides. Giv...
A: For fire requirements in a building an extra cross section for fire requirements of the member must ...
Q: a circular curve is to be constructed with a 225 ft radius and an interior angle of 55 degree. deter...
A: The circular curve in surveying : To link intersecting straight lines, circular curves are employed ...
Q: 1. The observed interior angles of a triangle and their corresponding number of times measured are a...
A:
Q: A simply supported beam of span 8 m is carrying a uniformly distributed load of 4 kN/m over a length...
A: Given, A simply supported beam, Length = L = 8m
Q: The three consecutive readings taken from a level are 1.325 m, 0.985 m and 2.546 m. If the instrumen...
A: Given data, Three conseutive readings taken from a level are 1.325 m , 0.985 m and 2.546 m the inst...
Q: A square plate having one of its side equal to 3 meters is immersed in water surface in a vertical p...
A: Given : 3 m square plate Distance between center of pressure and center of gravity is 8 cm = 0.08 m
Q: Your team want to measure line AB but there is an obstruction on line. You set up two lines AC and C...
A: To find length of line AB,BD,AD
Q: A cylindrical drum of 1500 m diameter contains 1000 litres of water and is open at the top. Find the...
A: Introduction : When cylindrical vessel containing liquid rotating with its axis vertical then the li...
Q: An off highway truck weights 70,000 lb empty and 150,000 Ib when loaded. The weight distribution emp...
A: 1. When the truck is empty ; Total weight on front Tyre = Truck weights * Weight distribution empty ...
Q: Question Number 2 and 3 required hand calculation.
A:
Q: 24000-ton coal/day having 4.2% Sulphur and emits gases at velocity of 18.3 m/s and temperature 140 °...
A: Plume height (∆h): For Neutral conditions Holland’s Equation is often used ∆h=vsdu1.5+2.68×10-3×ρ∆T...
Q: PROBLEM 1: Determine the mass of the heaviest uniform bar that can be supported in the positic if th...
A: T=16kN X=1.1m To find mass of bar
Q: The inclined truss is subjected to two forces as shown. Determine the moments at A and B due to the ...
A: For the given inclined truss,
Q: Determine the Skempton's pore pressure parameter 'A' using the following values given in table below...
A:
Q: Determine the value of concentrated load that must be placed at the crown of a two hinged parabolic ...
A:
Q: What is the Nominal Shear Capacity of the following shear splice 3/4" A325N bolts W18x35 W24x55 F1 1...
A: Anb = 3.14 x (3/4)2 = 1.76625 sq inch fu = 105ksi FOS = 1.25
Q: A steel rod, circular in cross-section, tapers from 30 mm diameter to 15 mm diameter over a length o...
A:
Q: A retaining wall with a smooth vertical back retains a purely cohesive fill. Height of wall is 12 m....
A: The active pressure arises when the wall moves away from the backfill. The total active thrust actin...
Q: A wet sand sample has a volume of 4.64 x 10-4 m3 and weighs 8N. After oven-drying, the weight reduce...
A:
Q: A noise meter located at a distance of 30 m from a point source recorded 74 dB. The reading at a dis...
A:
Q: A steel rod, circular in cross-section, tapers from 30 mm diameter to 15 mm diameter over a length o...
A:
Q: In a hydraulic jump occurring in a horizontal channel, the Froude's number before the jump is 10.0 a...
A:
Q: A simple curve of the proposed highway extension have a direction of tangents AB due North and BC wi...
A:
Q: Determine the maximum uniformly distributed service live load that a 40 ft. cantilever beam can carr...
A: Solution: Given: Span = 40 ft ϕ = 0.9; fc=4,000 psi, and fy=60,000 psi. Thew total cross sectional a...
what resources are the primary target of "resource management"
Step by step
Solved in 2 steps
- 5. Give 5 components of a Project Management Information System. 6. Give 4 key types of estimates.A schedule narrative can be used to O request an extension or further information from the owner plan the assignment of resources and costs conduct a sensitivity analysis highlight the effects that major changes have on the scheduleQuantity Surveyors routinely engage in unethical behaviour in the course of preparing payment certificates. Displays the potential unethical behaviours in preparing payment certificates.