When performing a leveling process for the longitudinal section of a road, the following readings were recorded: The first reading was taken on the leveling number (B.M1), whose Tevel is (60 meters), while the rest of the points were taken on the section points (00+0. 0+50 + 00+ 1... . (While working, lift the device after the fourth, seventh, and tenth reading. Arrange the readings in a table, then complete the table and verify the correctness of the calculations. Draw the segmént and establish a slope line inclined by 0.4% - and its level at the beginning of the project is 60 meters. Find the burial depth in each station. " Reading sequence 1 2 3 4 5 6 7 8 9 10 11 12 13 Reading the ruler 1.35 1.72 1.98 2.05 2.17 2.76 2.98 0.67 1.78 2.48 |2.88 3.10 3.39|

Structural Analysis
6th Edition
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:KASSIMALI, Aslam.
Chapter2: Loads On Structures
Section: Chapter Questions
Problem 1P
icon
Related questions
Question
100%
When performing a leveling process for the
longitudinal section of a road, the following readings
were recorded: The first reading was taken on the
leveling number (B.M1), whose Tevel is (60 meters),
while the rest of the points were taken on the section
points (00+0. 0+50 + 00+ 1... . (While working, lift the
device after the fourth, seventh, and tenth reading.
Arrange the readings in a table, then complete the
table and verify the correctness of the calculations.
Draw the segmént and establish a slope line inclined
by 0.4% - and its level at the beginning of the project is
60 meters. Find the burial depth in each station. "
Reading sequence 1 2 3 4 5 6 7
8 9 10 11 12 13
Reading the ruler 1.35 1.72 1.98 2.05 2.17 2.76 2.98 0.67 1.78 2.48 |2.88 3.10 3.39|
Transcribed Image Text:When performing a leveling process for the longitudinal section of a road, the following readings were recorded: The first reading was taken on the leveling number (B.M1), whose Tevel is (60 meters), while the rest of the points were taken on the section points (00+0. 0+50 + 00+ 1... . (While working, lift the device after the fourth, seventh, and tenth reading. Arrange the readings in a table, then complete the table and verify the correctness of the calculations. Draw the segmént and establish a slope line inclined by 0.4% - and its level at the beginning of the project is 60 meters. Find the burial depth in each station. " Reading sequence 1 2 3 4 5 6 7 8 9 10 11 12 13 Reading the ruler 1.35 1.72 1.98 2.05 2.17 2.76 2.98 0.67 1.78 2.48 |2.88 3.10 3.39|
Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Methods of Surveying
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Structural Analysis
Structural Analysis
Civil Engineering
ISBN:
9781337630931
Author:
KASSIMALI, Aslam.
Publisher:
Cengage,
Structural Analysis (10th Edition)
Structural Analysis (10th Edition)
Civil Engineering
ISBN:
9780134610672
Author:
Russell C. Hibbeler
Publisher:
PEARSON
Principles of Foundation Engineering (MindTap Cou…
Principles of Foundation Engineering (MindTap Cou…
Civil Engineering
ISBN:
9781337705028
Author:
Braja M. Das, Nagaratnam Sivakugan
Publisher:
Cengage Learning
Fundamentals of Structural Analysis
Fundamentals of Structural Analysis
Civil Engineering
ISBN:
9780073398006
Author:
Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:
McGraw-Hill Education
Sustainable Energy
Sustainable Energy
Civil Engineering
ISBN:
9781337551663
Author:
DUNLAP, Richard A.
Publisher:
Cengage,
Traffic and Highway Engineering
Traffic and Highway Engineering
Civil Engineering
ISBN:
9781305156241
Author:
Garber, Nicholas J.
Publisher:
Cengage Learning