Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below. Figure 1. Parts Moved Between Work Centers A A B C D Figure 2. Existing Layout A B -30¹- 325 0 0 C -- B 450 A -30% 0 0 C с 550 225 D -30- -30-1 feet (enter your response as a whole number). a) For the existing layout, the cumulative "load x distance" or "movement cost" = Based on the flows shown in the matrix, one should expect that the centers A and will be next to each other as they have the highest number of moves between each other. will be next to each other as they have the second highest number of moves between each other. Based on the flows shown in the matrix, one should expect that centers C and >) The aim is to improve the layout so that the total "movement cost" can be reduced. Functional locations for A and D have been fixed. In the improved layout, the work center that should be located between hem is: D 0 D D 50 0 725 -30¹- -30 The cumulative distance based on the overall movement of parts between work centers for this layout=feet (enter your response as a whole number).

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter2: Introduction To Spreadsheet Modeling
Section: Chapter Questions
Problem 20P: Julie James is opening a lemonade stand. She believes the fixed cost per week of running the stand...
icon
Related questions
Question
100%
Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below.
Figure 1. Parts Moved Between Work Centers
A
A
B
C
D
Figure 2. Existing Layout
A
B
-30'
-30¹-
с
-|-
325
0
0
a) For the existing layout, the cumulative "load x distance" or "movement cost" =
Based on the flows shown in the matrix, one should expect that the centers A and
Based on the flows shown in the matrix, one should expect that centers C and
b) The aim is to improve the layout so that the total "movement cost" can be reduced.
them is:
-30
D
-1
-30¹-
B
450
A
0
0
-30¹-
feet (enter your response as a whole number).
The cumulative distance based on the overall movement of parts between work centers for this layout=
C
550
225
-
will be next to each other as they have the highest number of moves between each other.
-30¹-
0
will be next to each other as they have the second highest number of moves between each other.
Functional locations for A and D have been fixed. In the improved layout, the work center that should be located between
D
D
D
50
0
725
feet (enter your response as a whole number).
Transcribed Image Text:Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below. Figure 1. Parts Moved Between Work Centers A A B C D Figure 2. Existing Layout A B -30' -30¹- с -|- 325 0 0 a) For the existing layout, the cumulative "load x distance" or "movement cost" = Based on the flows shown in the matrix, one should expect that the centers A and Based on the flows shown in the matrix, one should expect that centers C and b) The aim is to improve the layout so that the total "movement cost" can be reduced. them is: -30 D -1 -30¹- B 450 A 0 0 -30¹- feet (enter your response as a whole number). The cumulative distance based on the overall movement of parts between work centers for this layout= C 550 225 - will be next to each other as they have the highest number of moves between each other. -30¹- 0 will be next to each other as they have the second highest number of moves between each other. Functional locations for A and D have been fixed. In the improved layout, the work center that should be located between D D D 50 0 725 feet (enter your response as a whole number).
Expert Solution
steps

Step by step

Solved in 4 steps with 17 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,
Operations Management
Operations Management
Operations Management
ISBN:
9781259667473
Author:
William J Stevenson
Publisher:
McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi…
Operations and Supply Chain Management (Mcgraw-hi…
Operations Management
ISBN:
9781259666100
Author:
F. Robert Jacobs, Richard B Chase
Publisher:
McGraw-Hill Education
Business in Action
Business in Action
Operations Management
ISBN:
9780135198100
Author:
BOVEE
Publisher:
PEARSON CO
Purchasing and Supply Chain Management
Purchasing and Supply Chain Management
Operations Management
ISBN:
9781285869681
Author:
Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:
Cengage Learning
Production and Operations Analysis, Seventh Editi…
Production and Operations Analysis, Seventh Editi…
Operations Management
ISBN:
9781478623069
Author:
Steven Nahmias, Tava Lennon Olsen
Publisher:
Waveland Press, Inc.