Fundamentals Of Construction Estimating
4th Edition
ISBN: 9781337399395
Author: Pratt, David J.
Publisher: Cengage,
expand_more
expand_more
format_list_bulleted
Question
Chapter 1, Problem 6RQ
To determine
The cost per square foot (square meter).
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
If construction cost $95 per square foot how can I find the cost of building the home?
The preliminary cost for a 51,000 ft2 aircraft hangar must be estimated.
The first unit estimate was $101 per square foot. Estimate the cost of the hangar.
The cost of the hangar is determined to be $ .
If the average height of the building described in question 6 is 12'4" (3.8 m) to the roof surface, what is the cost per unit volume?
Chapter 1 Solutions
Fundamentals Of Construction Estimating
Knowledge Booster
Similar questions
- If you will construct your own house, what modern technology construction method are you going to apply? Why?arrow_forwardYou want a mountain cabin built for weekend trips, vacations, to host family, and perhaps eventually to retire in. After discussing the project with a local contractor, you receive an estimate that the total con- struction cost of your 2000-ft2 lodge will be $250,000. The percentage of costs is broken down as follows: Percentage of Cost Items Total Costs Construction permits, legal and 8 title fees Roadway, site clearing, preparation Foundation, concrete, masonry Wallboard, flooring, carpentry Heating, ventilation, air conditioning (HVAC) Electric, plumbing, communications Roofing, flooring Painting, finishing 15 13 12 13 10 12 17 100 (a) What is the cost per square foot of the 2000-ft2 lodge? (b) If you are also considering a 4000-ft² layout option, estimate your construction costs if: i. All cost items (in the table) change propor- tionately to the size increase. ii. The first two cost items do not change at all; HVAC changes by 50%; and all others are proportionate.arrow_forwardWhat will be the rough cost estimate for a first- class building having a plinth area of 100 m², if the rate/m², if the rate/m² is Rs. 600 and necessary additions of 20% are to be made for public health worth?arrow_forward
- List down all possible resources that you need in building a house.arrow_forwardYou are now to renovate your bedroom to your dream bedroom at a certain budget given by your parents. How are you going to manage the cost of the renovation? There are four primary phases in construction management that you may apply. Explain in sequence each of these phases.arrow_forwardWhat will be the rough cost estimate for a first-class building having a plinth area of 100m², if the rate/m² is Rs. 600 and necessary additions of 20% are to be made for public health's worth?arrow_forward
- What is a multifamily housing?arrow_forwardgive detailed neat and cleAN ANSWER There is a rectangular field in San Diego Zoo for an Elephant with the area of 580 sqft. Three sides should be made with a $12.5 per foot wooden wall, while the fourth side should be made with a $18.5 per foot green plastic wall. Determine the field dimensions that will result in the lowest total costarrow_forwardWhat are the difficulties faced by residents in high rise buildings such as condominium, etc. Explain in detail. apartments,arrow_forward
- Two installers will install the unit. Each will work the same amount of timeand will be paid $8.00 per hour. How much will each installer earn fromthis job?arrow_forwardYou are a licensed Civil Engineer. Your brother prepared a drawing plan and structural design for one of his projects. However, since he is not yet a Licensed CE, he requested you for your approval and signature of the same, offering you a certain amount as payment. Will you give your approval/signature for the said plan and design? Why?arrow_forwardThis assignment consists of determining the quantities for a cost estimate in different units. Assume a rectangular warehouse with internal measurements of 22' wide, 34’long and 12' high. The warehouse has (including the frame): One 6' wide and 5' high window on all walls. A 6' wide and 8' high door in the front wall. Walls: 6” block (above floor) Concrete: thickness of ceiling = 5” and floor = 4” Assume 4 14” x 14” columns (1 column at each corner of warehouse) and one beam throughout perimeter below ceiling 14" wide and 20" high. The 4” concrete floor has a 6” wide by 12” high perimeter beam. The column footing will be counted 2'-6" from the top of the floor. Square footing size is 6'-0" x 6'-0" by 12" thick. Make a drawing with your best interpretationarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Fundamentals Of Construction EstimatingCivil EngineeringISBN:9781337399395Author:Pratt, David J.Publisher:Cengage,Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Fundamentals Of Construction Estimating
Civil Engineering
ISBN:9781337399395
Author:Pratt, David J.
Publisher:Cengage,
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning