To determine: The standard time for the operation
Introduction: Time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.
Answer to Problem 22P
Thestandard time is calculated as 10.12 minutes.
Explanation of Solution
Given information:
The allowance factor is given as 10%. The observed time and performance rating for each element is given as follows:
Element | Performance rating | Observation (minutes per cycle) | ||||
1 | 2 | 3 | 4 | 5 | ||
Check mini-bar | 100 | 1.5 | 1.6 | 1.4 | 1.5 | 1.5 |
Make one bed | 90 | 2.3 | 2.5 | 2.1 | 2.2 | 2.4 |
Vacuum floor | 120 | 1.7 | 1.9 | 1.9 | 1.4 | 1.6 |
Clean bath | 100 | 3.5 | 3.6 | 3.6 | 3.6 | 3.2 |
Formulae to calculate the standard time:
Calculate the standard time:
Element | Performance rating | Observation (minutes per cycle) | Average time | Normal time | ||||
1 | 2 | 3 | 4 | 5 | ||||
Check mini-bar | 100% | 1.5 | 1.6 | 1.4 | 1.5 | 1.5 | 1.5 | 1.5 |
Make one bed | 90% | 2.3 | 2.5 | 2.1 | 2.2 | 2.4 | 2.3 | 2.07 |
Vacuum floor | 120% | 1.7 | 1.9 | 1.9 | 1.4 | 1.6 | 1.7 | 2.04 |
Clean bath | 100% | 3.5 | 3.6 | 3.6 | 3.6 | 3.2 | 3.5 | 3.5 |
Total | 9.11 |
Excel worksheet:
Calculate the average time to check mini-bar:
The average time is calculated by taking an average of the observation given, which is a summation of 1.5, 1.6, 1.4, 1.5, and 1.5 and dividing the result by 5. Hence, the average is 1.5 minutes.
Calculate the average time to make one bed:
The average time is calculated by taking an average of the observation given, which is summation of 2.3, 2.5, 2.1, 2.2, and 2.4 and dividing the result by 5. Hence, the average is 2.3 minutes.
Calculate the average time to vacuum floor:
The average time is calculated by taking an average of the observation given, which is summation of 1.7, 1.9, 1.9, 1.4, and 1.6 and dividing the result by 5. Hence, the average is 1.7 minutes.
Calculate the average time to clean bath:
The normal average time is calculated by taking an average of the observation given, which is summation of 3.5, 3.6, 3.6, 3.6, and 3.2 and dividing the result by 5. Hence, the average is 3.5 minutes.
Calculate the normal time to check mini-bar:
The normal time is calculated by multiplying average time and performance rating. The average time is given as 1.5 minutes, and performance rating is given as 100%. Hence, the normal time is 1.5 minutes.
Calculate the normal time to make one bed:
The normal time is calculated by multiplying average time and performance rating. The average time is given as 2.3 minutes, and performance rating is given as 90%. Hence, the normal time is 2.07 minutes.
Calculate the normal time to vacuum floor:
The normal time is calculated by multiplying average time and performance rating. The average time is given as 1.7 minutes, and performance rating is given as 120%. Hence, the normal time is 2.04 minutes.
Calculate the normal time to clean bath:
The normal time is calculated by multiplying average time and performance rating. The average time is given as 3.5 minutes, and performance rating is given as 100%. Hence, the normal time is 3.5 minutes.
Calculate the total normal time:
The normal time is calculate by adding the normal time to check the mini-bar, make one bed, vacuum floor, and clean bath.
Hence, the total normal time is 9.11 minutes.
Calculate the standard time:
The standard time is calculated by dividing the normal time with the value attained by subtracting the allowance factor from 1. Normal time is calculated as 9.11 minutes and the allowance factor is calculated as 0.10 or 10%.
Hence, the standard time is 10.12 minutes.
Want to see more full solutions like this?
Chapter 10 Solutions
Principles Of Operations Management
- Describe the steps involved in conducting a time study,and discuss any difficulties you might envision at varioussteps.arrow_forwardInstalling mufflers at the O'Sullivan Garage in Golden, Colorado, involves five work elements. Jill O'Sull ivanhas timed workers performing these tasks seven times, with the results shown in the following table: By agreement with her workers, Jill allows a 10% fatigue factor and a 10% personal-time factor, but no time for delay. To compute standard time for the work operatio n, Jill excludes all observations that a ppear to be unusual or nonrecurring. She does not want an error of mo re than ±5%.a) What is the standard time for the task?b) How many observations are needed to assu re a 95% confidence level?arrow_forwardInstalling mufflers at the Stanley Garage in Golden, Colorado, involves five work elements. Linda Stanley has timed workers performing these tasks seven times, with the results shown in the following table. Job elements OBSERVATIONS (MINUTES) Performance rating (%) 1 2 3 4 5 6 7 1 Select correct mufflers 4 5 4 6 4 15 4 100 2 Remove muffler 6 8 7 6 7 6 7 90 3 Weld/install new muffler 15 14 14 12 15 16 13 105 4 Check/inspect work 3 4 24 5 4 3 18 100 5 Complete paperwork 5 6 8 - 7 6 7 130 By agreement with her workers, Stanley allows a 10% fatigue factor and a 10% personal-time factor. To compute standard time for the work operation, Stanley excludes all observations that appear to be unusual or nonrecurring. She does not want an error of more than 5%. What is the standard time for the task? How many observations are needed to assure a 95.45%…arrow_forward
- Based on a careful work study in the Hofstetter Corp., the results shown in the following table have been observed: a) Compute the normal time for each work element.b) If the allowance for this type of work is 15%, what is the standard time?c) How many observations are needed for a 95% confidence level within ±5% accuracy? (Hint: Calculate the sample size of each element.)arrow_forwardLatisha Simmons, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table. Task Element 1 2 3 4 Performance Rating 110% 85% 90% 85% 1 0.6 0.6 0.5 1.4 Observation (minutes per cycle) 2 3 4 0.3 0.8 0.5 1.9 0.6 0.7 0.6 1.9 0.4 0.6 0.5 1.7 The allowances for tasks such as this are personal, 8%; fatigue, 12%; and delay, 3%. minutes (round your response to two a) The normal time for the complete operation : = decimal places). b) The standard time for this process = minutes (round your response to two decimal places). 0.5 0.8 0.5 1.4arrow_forwardDescribe some of the limitations of time study method ?arrow_forward
- Use the data in the table below to answer questions 1 to 3. Observation 1 2 3 4 5 6 7 8 Time (seconds) 17 18 15 14 13 15 16 2 1. Using the data above, calculate the observed time for the task. 2. If the person observed worked at a pace that is 80% of normal, what should be the normal timefor this task? 3. If the person observed worked at a pace that is 80% of normal, and if the appropriate allowance for this task is 25% of job time, what should be the standard time?arrow_forwardTOYS AND JOB DESIGN AT THE HOVEY AND BEARD COMPANY The following is a situation that occurred in the Hovey and Beard Company, as reported by J. V. Clark. This company manufactured a line of wooden toys. One part of the process involved spray painting partially assembled toys, after which the toys were hung on moving hooks that carried them through a drying oven. The operation, staffed entirely by women, was plagued with absenteeism, high turnover, and low morale. Each woman at her paint booth would take a toy from the tray beside her, position it in a fixture, and spray on the color according to the required pattern. She then would release the toy and hang it on the conveyor hook. The rate at which the hooks moved had been calculated so that each woman, once fully trained, would be able to hang a painted toy on each hook before it passed beyond her reach. The women who worked in the paint room were on a group incentive plan that tied their earnings to the…arrow_forwardK Latisha Simmons, a loan processor at Wentworth Bank, has been timed performing four work elements, with the results shown in the following table. Task Element 1 2 3 4 Performance Rating 115% 95% 85% 80% 1 0.5 0.6 0.7 1.6 Observation (minutes per cycle) 2 3 4 0.4 0.9 0.4 1.9 0.5 0.7 0.6 2.1 0.3 0.6 0.4 1.7 5 0.3 0.7 0.4 1.5 The allowances for tasks such as this are personal, 8%; fatigue, 10%; and delay, 2%. a) The normal time for the complete operation = minutes (round your response to two decimal places). b) The standard time for this process = minutes (round your response to two decimal places).arrow_forward
- After training, Mary Fernandez, a computer tech-nician, had an average observed time for memory-chip tests of 12 seconds. Mary’s performance rating is 100%. The firm has apersonal fatigue and delay allowance of 15%.a) Find the normal time for this process.b) Find the standard time for this process.arrow_forwardDescribe the job design to specify the work material and methods?arrow_forwardA Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of a ruler, square, and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction). In a preliminary study, he observed one of his workers performing this task five times. The observations were made in an air-conditioned, well-lit training facility, at ground level, with all tools and equipment clean and readily available. Observation: 1 2 3 4 5 Task time (seconds): 82 74 80 88 76 (a) What is the actual average time for this task? (b) What is the normal time for this task if the employee worked at a 10% faster pace than is typical for adequately trained workers? (c) What is standard time for this task if allowances sum to 12%? (d) If the analyst then thought more carefully about his experiment and decided that the allowances needed to be increased to match the real (outside, not…arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.