(Appendix used in requirement [c]) Comprehensive Cost
Maple Leaf Production manufactures truck tires. The following information is available for the last operating period.
- Maple Leaf produced and sold 92,000 tires for $40 each. Budgeted production was 100,000 tires.
- Standard variable costs per tire follow:
- Fixed production
overhead costs:
- Fixed overhead is applied at the rate of $15 per tire.
- Actual production costs:
Required
- a. Prepare a cost variance analysis for each variable cost for Maple Leaf Productions.
- b. Prepare a fixed overhead cost variance analysis.
- c. (Appendix) Prepare the
journal entries to record the activity for the last period usingstandard costing . Assume that all variances are closed to Cost of Goods Sold at the end of the operating period.
a.
Prepare a cost variance analysis for each variable costs.
Explanation of Solution
Variable cost variance analysis:
The cost analysis of the difference between the actual cost incurred and the budgeted or standard costs that varies with production levels is called the variable cost variance analysis.
Prepare a variable cost variance analysis:
Direct Material Variances | Amount |
Price Variance | $ 76,800F(1) |
Efficiency Variance | $ 32,000U(2) |
Total Variance | $ 44,800F |
Direct Labor Variances | |
Price Variance | $ 14,080U(3) |
Efficiency Variance | $ 28,800F(4) |
Total Variance | $ 13,920F |
Variable Overhead Variance: | |
Price Variance | $ 3,456U(5) |
Efficiency Variance | $ 7,200U(6) |
Total Variance | $ 3,744U |
Table: (1)
Working Note 1:
Working Note 2:
Working Note 3:
Working Note 4:
Working Note 5:
Working Note 6:
b.
Prepare a fixed overhead cost variance analysis.
Explanation of Solution
Fixed overhead cost variance analysis:
The cost analysis of the difference between the fixed overhead cost incurred and the budgeted or standard fixed overhead costs is called the fixed overhead cost variance analysis.
Prepare a fixed overhead cost variance analysis:
Fixed Overhead Variances | |
Price Variance | $ 10,000U |
Production volume variance | $30,000F(7) |
Total Variance | $ 20,000F |
Table: (2)
Working Note 7:
c.
Prepare journal entries to record the activity based on standard costing.
Explanation of Solution
Journal Entries Using Standard Costing:
While the recording of production processes is done using standard costing, all the costs transferred will be recorded at standard cost without knowing the actual costs or incurring the actual costs.
Prepare the journal entries based on standard costing:
Date | Accounts Title and Explanation | Post Ref. | Debit | Credit |
Journal Entries for Direct Material | ||||
Work-in-Process Inventory | $ 7,36,000 | |||
Materials Efficiency Variance | $32,000 | |||
Materials Price Variance | $76,800 | |||
Accounts Payable | $ 6,91,200 | |||
(To record the purchase of direct material and variances) | ||||
Journal Entries for Direct Labor | ||||
Work-in-Process Inventory | $ 6,62,400 | |||
Direct Labor Price Variance | $14,080 | |||
Direct Labor Efficiency Variance | $28,800 | |||
Wages Payable | $ 6,47,680 | |||
To record the cost of direct labor and variances) | ||||
Journal Entries for Variable Overhead | ||||
Work-in-Process Inventory | $ 1,65,600 | |||
Variable Overhead Applied | $ 1,65,600 | |||
(To transfer the balance of variable overhead applied account) | ||||
Variable Overhead (Actual) | $ 1,76,256 | |||
Miscellaneous Payables and Inventory Accounts | $ 1,76,256 | |||
(To record the actual overhead cost incurred during the production) | ||||
Variable Overhead (Applied) | $ 1,65,600 | |||
Variable Overhead Price Variance | $3,456 | |||
Variable Overhead Efficiency Variance | $7,200 | |||
Variable Overhead (Actual) | $ 1,76,256 | |||
(To record and transfer the balance of overhead applied and variance) | ||||
Journal Entries for Fixed Overhead | ||||
Work-in-Process Inventory | $13,80,000 | |||
Fixed Overhead Applied | $13,80,000 | |||
(To record the cost of fixed overhead applied) | ||||
Fixed Overhead (Actual) | $13,60,000 | |||
Miscellaneous Payables and Inventory Accounts | $13,60,000 | |||
(To record the fixed overhead actual cost incurred) | ||||
Fixed Overhead (Applied) | $13,80,000 | |||
Fixed Overhead Price Variance | $10,000 | |||
Fixed Overhead Production volume variance | $30,000 | |||
Fixed Overhead (Actual) | $13,60,000 | |||
(To record fixed overhead variances and applied amount to the production) | ||||
Journal Entries for finished goods | ||||
Finished Goods Inventory | $29,44,000 | |||
Work-in-Process Inventory | $29,44,000 | |||
(To transfer the finished goods inventory balance to work-in-process account) | ||||
Recording 92,000 tires' sale | ||||
Accounts Receivable | $36,80,000 | |||
Sales Revenue | $36,80,000 | |||
Cost of Goods Sold | $29,44,000 | |||
Finished Goods Inventory | $29,44,000 | |||
(To record the sale of finished goods and transfer the balance to finished goods account) | ||||
Journal entries for recording variance | ||||
Materials Price Variance | $76,800 | |||
Direct Labor Efficiency Variance | $28,800 | |||
Fixed Overhead Production Volume Variance | $30,000 | |||
Materials Efficiency Variance | $32,000 | |||
Direct Labor Price Variance | $14,080 | |||
Variable Overhead Price Variance | $3,456 | |||
Variable Overhead Efficiency Variance | $7,200 | |||
Fixed Overhead Price Variance | $10,000 | |||
Cost of Goods Sold | $68,864 | |||
(Transferring the variance balances to cost of goods sold) |
Table: (3)
Want to see more full solutions like this?
Chapter 16 Solutions
Fundamentals Of Cost Accounting (6th Edition)
- Kavallia Company set a standard cost for one item at 328,000; allowable deviation is 14,500. Actual costs for the past six months are as follows: Required: 1. Calculate the variance from standard for each month. Which months should be investigated? 2. What if the company uses a two-part rule for investigating variances? The allowable deviation is the lesser of 4 percent of the standard amount or 14,500. Now which months should be investigated?arrow_forwardRefer to Cornerstone Exercise 8.13. In March, Nashler Company produced 163,200 units and had the following actual costs: Required: 1. Prepare a performance report for Nashler Company comparing actual costs with the flexible budget for actual units produced. 2. What if Nashler Companys actual direct materials cost were 1,175,040? How would that affect the variance for direct materials? The total cost variance?arrow_forwardEd Co. manufactures two types of O rings, large and small. Both rings use the same material but require different amounts. Standard materials for both are shown. At the beginning of the month, Edve Co. bought 25,000 feet of rubber for $6.875. The company made 3,000 large O rings and 4,000 small O rings. The company used 14,500 feet of rubber. A. What are the direct materials price variance, the direct materials quantity variance, and the total direct materials cost variance? B. If they bought 10,000 connectors costing $310, what would the direct materials price variance be for the connectors? C. If there was an unfavorable direct materials price variance of $125, how much did they pay per toot for the rubber?arrow_forward
- A manufacturer planned to use $78 of variable overhead per unit produced, but in the most recent period, it actually used $76 of variable overhead per unit produced. During this same period, the company planned to produce 500 units but actually produced 540 units. What is the variable overhead spending variance?arrow_forwardUse the following standard cost card for 1 gallon of ice cream to answer the questions. Actual direct costs incurred to make 50 gallons of ice cream: 275 quarts of cream at $1.05 per quart 832 ounces of sugar at $0.075 per ounce 165 minutes of labor at $37 per hour All material used was bought during the current period. A. Compute the material and labor variances. B. Comment on the results and possible causes of the variances.arrow_forwardEagle Inc. uses a standard cost system. During the most recent period, the company manufactured 115,000 units. The standard cost sheet indicates that the standard direct labor cost per unit is $1.50. The performance report for the period includes an unfavorable direct labor rate variance of $3,700 and a favorable direct labor time variance of $10,275. What was the total actual cost of direct labor incurred during the period?arrow_forward
- Georgia Gasket Co. budgets 8,000 direct labor hours for the year. The total overhead budget is expected to amount to 20,000. The standard cost for a unit of the companys product estimates the variable overhead as follows: The actual data for the period follow: Using the four-variance method, calculate the overhead variances. (Hint: First compute the budgeted fixed overhead rate.)arrow_forwardUse the following information to complete Brief Exercises 10-36 and 10-37: Ambient Inc. produces aluminum cans. Each can has a standard labor requirement of 0.03 hour. During the month of May, 500,000 cans were produced using 14,000 labor hours @ 15.00. The standard wage rate is 14.50 per hour. 10-37 Labor Rate and Efficiency Variances Refer to the information for Ambient Inc. above. Required: Calculate the labor rate and efficiency variances using the columnar and formula approaches.arrow_forwardRequirements 1. Calculate the inventoriable cost per unit using each level of capacity to compute fixed manufacturing cost per unit 2. Suppose EBL actually produces 250,000 bulbs. Calculate the production-volume variance using each level of capacity to compute the fixed manufacturing overhead allocation rate. 3. Assume EBL has no beginning inventory If this year's actual sales are 187,500 bulbs, calculate operating income for EBL using each type of capacity to compute fixed manufacturing cost per unit please complete requirment part 1,2,3arrow_forward
- Determining Unit Costs, Variance Analysis, and InterpretationBig Dog Company, a manufacturer of dog food, produces its product in 1,000-bag batches. The standard cost of each batch consists of 9,000 pounds of direct materials at $0.40 per pound, 48 direct labor hours at $8.50 per hour, and variable overhead cost (based on machine hours) at the rate of $10 per hour with 16 machine hours per batch. The following variable costs were incurred for the last 1,000-bag batch produced: Direct materials 9,300 pounds costing $3,578 were purchased and used Direct labor 45 hours costing $450 Variable overhead $225 Machine hours used 18 hours (a) Determine the actual and standard variable costs per bag of dog food produced, separated into direct materials, direct labor, and variable overhead. Round your answers to three decimal places. Actual Cost Standard Cost Direct materials 3.578 3.6 Direct labor .45 .408 Variable overhead .225 .16 Total…arrow_forwardDetermining Unit Costs, Variance Analysis, and Interpretation Big Dog Company, a manufacturer of dog food, produces its product in 1,000-bag batches. The standard cost of each batch consists of 9,000 pounds of direct materials at $0.40 per pound, 48 direct labor hours at $8.50 per hour, and variable overhead cost (based on machine hours) at the rate of $10 per hour with 16 machine hours per batch. The following variable costs were incurred for the last 1,000-bag batch produced: Direct materials Direct labor Variable overhead Machine hours used 9,300 pounds costing $3,578 were purchased and used 45 hours costing $450 $225 18 hours (a) Determine the actual and standard variable costs per bag of dog food produced, separated into direct materials, direct labor, and variable overhead. Round your answers to three decimal places. Actual Cost Standard Cost $ 3.6 (930) * 0.45 ✔ 0.408 0.16 ✔ 0.225 ✔ 4.136 * $ 4.168 ✔ Direct materials Direct labor Variable overhead Total variable costs per bag $…arrow_forwardRequired information (The following information applies to the questions displayed below.] BatCo makes baseball bats. Each bat requires 1.00 pounds of wood at $18 per pound and 0.25 direct labor hour at $30 per hour. Overhead is assigned at the rate of $60 per direct labor hour. Assume the actual cost to manufacture 120 bats is $5,700.00. Compute the total cost variance and identify it as favorable or unfavorable. (Indicate the effect of the variance by selecting favorable, unfavorable. or no variance.) Actual cost Budgeted standard cost Total cost variancearrow_forward
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
- Principles of Cost AccountingAccountingISBN:9781305087408Author:Edward J. Vanderbeck, Maria R. MitchellPublisher:Cengage Learning