Accounting Information Systems
10th Edition
ISBN: 9781337619202
Author: Hall, James A.
Publisher: Cengage Learning,
expand_more
expand_more
format_list_bulleted
Question
Chapter 5, Problem 4ICC
a.
To determine
Prepare a data flow diagram of the current system.
b.
To determine
Prepare the system flowchart of the existing system.
c.
To determine
Explain the physical internal control weaknesses in the system.
d.
To determine
Discuss the risks associated with physical internal control weaknesses.
e.
To determine
Create a system flowchart of a redesigned computer-based system that resolves the control weaknesses identified.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete.
The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units. A batch of 45 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25 minutes. The…
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC)
board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals
are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for
soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards.
Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the
assembled boards to the final assembly area. This move takes 9 minutes to complete.
The final assembly for each stereo unit requires 18 minutes and is also done in batches of 50 units. A batch of 50
stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the
test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…
Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing
process includes printed circuit (PC) board assembly, final assembly, testing, and
shipping. In the PC board assembly operation, a number of individuals are
responsible for assembling electronic components into printed circuit boards. Each
operator is responsible for soldering components according to a given set of
instructions. Operators work on batches of 50 printed circuit boards. Each board
requires 4 minutes of board assembly time. After each batch is completed, the
operator moves the assembled boards to the final assembly area. This move takes 9
minutes to complete.
The final assembly for each stereo unit requires 21 minutes and is also done in
batches of 50 units. A batch of 50 stereos is moved into the test building, which is
across the street. The move takes 20 minutes. Before conducting the test, the test
equipment must be set up for the particular stereo model. The test setup requires
30 minutes. The…
Chapter 5 Solutions
Accounting Information Systems
Ch. 5 - Prob. 1RQCh. 5 - What purpose does a purchasing department serve?Ch. 5 - Prob. 3RQCh. 5 - Prob. 4RQCh. 5 - Prob. 5RQCh. 5 - Prob. 6RQCh. 5 - Prob. 7RQCh. 5 - Prob. 8RQCh. 5 - Prob. 9RQCh. 5 - Some organizations do not use an AP subsidiary...
Ch. 5 - What is the purpose of the blind copy of a PO?Ch. 5 - Prob. 12RQCh. 5 - Prob. 1DQCh. 5 - Prob. 2DQCh. 5 - Prob. 3DQCh. 5 - The level of day-to-day department activity in...Ch. 5 - Prob. 5DQCh. 5 - What is central to a successful EDI...Ch. 5 - Discuss the objective of eliminating the receiving...Ch. 5 - What purpose does multilevel security control play...Ch. 5 - Prob. 9DQCh. 5 - Prob. 10DQCh. 5 - Which of the following statements is correct? a....Ch. 5 - Which of the following represents incompatible...Ch. 5 - Prob. 3MCQCh. 5 - Prob. 4MCQCh. 5 - Prob. 5MCQCh. 5 - Prob. 6MCQCh. 5 - Prob. 7MCQCh. 5 - Which of the following tasks should the cash...Ch. 5 - Which ledger can be updated solely from the...Ch. 5 - Prob. 10MCQCh. 5 - Prob. 1PCh. 5 - INVENTORY ORDERING ALTERNATIVES The flowchart for...Ch. 5 - Prob. 3PCh. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10PCh. 5 - Prob. 11PCh. 5 - UNRECORDED LIABILITIES You are auditing the...Ch. 5 - SMITHS MARKET (SMALL BUSINESS ACCOUNTING SYSTEM)...Ch. 5 - POSAVEK REMODELING AND BUILDING SUPPLY COMPANY...Ch. 5 - GREEN POND NURSERY (STANDALONE PC-BASED ACCOUNTING...Ch. 5 - Prob. 4ICCCh. 5 - Prob. 5ICCCh. 5 - Prob. 6ICCCh. 5 - Prob. 7ICCCh. 5 - Prob. 8ICC
Knowledge Booster
Similar questions
- Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 12 minutes to complete. The final assembly for each stereo unit requires 19 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardLead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 18 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30…arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 13,000 5,000 4,500 3,500 Materials cost $ 9,820,000 $ 2,500,000 $ 3,420,000 $ 3,900,000 Conversion costs Assembly…arrow_forward
- Coastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 11,500 4,500 4,000 3,000 Materials cost $ 8,590,000 $ 2,250,000 $ 3,040,000 $ 3,300,000 Conversion costs Assembly…arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components from vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization Department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced 11,500 4,500 4,000 3,000 Materials cost $ 8,395,000 $ 2,250,000 $ 2,845,000 $ 3,300,000 Conversion costs…arrow_forwardCoastal Cycles makes three models of electric bicycles: E20, E35, and E60. The models differ by the size of the battery and the quality of the components. The bicycles are produced in two departments. The Assembly Department purchases components form vendors and assembles them into bicycles. The models E20 and E35 are complete and ready for sale after completing the assembly process. The model E60 undergoes further process in Customization department, which is actually just a small area in the same building as the Assembly Department. Conversion costs in both the Assembly Department and Customization Department are based on the number of units produced. There are never any work-in-process inventories. Data for production in November are shown in the following table. Total E20 E35 E60 Units produced…arrow_forward
- Lead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 20 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 16 minutes and is also done in batches of 20 units. A batch of 20 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25…arrow_forwardiSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 21 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardLead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 20 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 16 minutes and is also done in batches of 20 units. A batch of 20 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25…arrow_forward
- The ABC garments factory produces two type of jacket, Denim and Polyester. The research and development team is composed of two Product Engineer experts in making denim and polyester jacket. The given information for product development shown below. Product Engineer 1 salary 22,000 Product Engineer 2 salary 22,000 Transportation expense of Product Engineer 1 5,000 Transportation expense of Product Engineer 2 5,000 Direct material used in sample making for Denim jacket 10,000 Direct material used in sample making for Polyester jacket 9,000 Machine electricity consumption (in Php) 1,400 The demand for denim jacket in color black is 4,000 pieces, while the color gray is 2,000 pieces. The polyester jacket demand is 5,000 pieces. The total sales of Denim jacket (black and gray) is Php 65, 000 and Php 55,550 in polyester jacket. The Company owner want to determine the minimum factory overheads cost among the two type of jacket.arrow_forwardLead timeSound Tek Inc. manufactures electronic stereo equipment. Themanufacturing process includes printed circuit (PC) board assembly,final assembly, testing, and shipping. In the PC board assemblyoperation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator isresponsible for soldering components according to a given set ofinstructions. Operators work on batches of 45 printed circuit boards.Each board requires 5 minutes of board assembly time. After each batchis completed, the operator moves die assembled boards to the finalassembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 15 minutes and is alsodone in batches of 45 units. A batch of 45 stereos is moved into the testbuilding, which is across the street. The move takes 20 minutes. Beforeconducting the test, the test equipment must be set up for the particularstereo model. The test setup requires 25 minutes. The…arrow_forwardCrex Co was set up by Cynthia Rex who created her own brand of chalk paint 20 years ago. Using her background in fine art, she developed this specialist chalk paint to be used in the restoration of furniture and to decorate accessories. The chalk paints are exclusively available through Crex Co's network of over 800 independent stockists who are located in over 30 countries around the world. The manufacturing process begins with the three chemicals required for the paint being measured on electronic scales. A worker then takes the chemicals and places them into a machine for mixing. Once mixed the worker removes the mixture from the machine and transfers it to tin containers. The standard material costs per litre of chalk paint are as follows: Litres required $ per litre 0.80 1.20 0.15 1.40 0.10 0.80 1.05 Material Latex paint Plaster of Paris Calcium carbonate At the end of the last period, actual output of the chalk paint was 3,325 litres and actual data relating to this production…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Accounting Information SystemsAccountingISBN:9781337619202Author:Hall, James A.Publisher:Cengage Learning,
Accounting Information Systems
Accounting
ISBN:9781337619202
Author:Hall, James A.
Publisher:Cengage Learning,