CodeHead Software Inc. does software development. One important activity in software development is writing software code. The manager of the WordPro Development Team determined that the average software programmer could write 25 lines of code in an hour. The plan for the first week in May called for 4,650 lines of code to be written on the WordPro product. The WordPro Team has five programmers. Each programmer is hired from an employment firm that requires temporary employees to be hired for a minimum of a 40-hour week. Programmers are paid $32.00 per hour. The manager offered a bonus if the team could generate more lines for the week, without overtime. Due to a project emergency, the programmers wrote more code in the first week of May than planned. The actual amount of code written in the first week of May was 5,650 lines, without overtime. As a result, the bonus caused the average programmer’s hourly rate to increase to $40.00 per hour during the first week in May.
Instructions
- 1. If the team generated 4,650 lines of code according to the original plan, what would have been the labor time variance?
- 2. What was the actual labor time variance as a result of generating 5,650 lines of code?
- 3. What was the labor rate variance as a result of the bonus?
- 4. The manager is trying to determine if a better decision would have been to hire a temporary programmer to meet the higher programming demand in the first week of May, rather than paying out the bonus. If another employee was hired from the employment firm, what would have been the labor time variance in the first week?
- 5. Which decision is better, paying the bonus or hiring another programmer?
1.
Compute the direct labor time variance, if the team had generated 4,650 lines of code according to the original plan.
Explanation of Solution
Direct labor variances:
The difference between the actual labor cost in the production and the standard labor cost for actual production is known as direct labor cost variance. The direct labor variance can be classified as follows:
- v Labor rate variance.
- v Labor time variance.
Determine the direct labor time variance.
Working note (1):
Compute the actual labor hours:
Working note (2):
Compute the standard direct labor hours:
The direct labor time variance is $448 and it is an unfavorable variance, since the actual direct labor hour is more than the standard direct labor hour.
2.
Compute the actual labor time variance, as a result of generating 5,650 lines of code.
Explanation of Solution
Determine the direct labor time variance.
Working note (3):
The direct labor time variance is $(832) and it is a favorable variance, since the actual direct labor hour is lesser than the standard direct labor hour.
3.
Compute the direct labor rate variance as a result of the bonus.
Explanation of Solution
Determine the direct labor rate variance.
The direct labor rate variance is $1,600 and it is an unfavorable variance, since the actual rate per hour is more than the standard rate per hour.
4.
Compute the labor time variance in the first week if a new employee had been hired from the employment firm.
Explanation of Solution
Determine the direct labor time variance:
Working note (4):
The direct labor time variance is $448 and it is an unfavorable variance, since the actual direct labor hour is more than the standard direct labor hour.
5.
State the decision that would be better, paying the bonus, or hiring another programmer.
Answer to Problem 5PA
Hiring an extra employee is the better decision when compared to paying the bonus as hiring another programmer is less costly.
Explanation of Solution
Determine the total direct labor cost time variance.
The direct labor cost variance for paying the bonus is $768 and it is an unfavorable variance, since the direct labor rate variance is more than the direct labor time variance. The labor cost variance in hiring another programmer would have been $448 which is unfavorable, which is less than the cost of paying the bonus.
Hence, the net benefit of hiring another programmer when compared to paying the bonus is $320
Want to see more full solutions like this?
Chapter 8 Solutions
Bundle: Managerial Accounting, 14th + Cengagenowv2, 1 Term Printed Access Card
- A small manufacturer of small metal components is planning its production for next month. The company has two products, Product A and Product B. Profit for Product A is $64per case, and profit for Product B is $87 per case. The three main departments at the manufacturing plant are cutting, trimming, and coating. In the production process, metal bars are first cut to the proper length, then trimmed to the desired angle, then coated with corrosive protection. Each production department works two8-hour shifts, 5days per week. The production rates for parts in each production department are shown below Production Rates(cases/shift) Cutting Trimming Coating Product A 3.2 2.0 0 Product B 2.5 4.0 1.0 How many cases of each product should be produced per week to maximize profits?arrow_forwardOne of the operations in the Wonderland Post Office is a mechanical mail sorting operation. In this operation, letter mail is sorted at a rate of one letter per second. The letter is mechanically sorted from a three-digit code input by an operator sitting at a keyboard. The manager of the mechanical sorting operation wants to determine the number of temporary employees to hire for December. The manager estimates that there will be an additional 23,850,000 pieces of mail in December, due to the upcoming holiday season. Assume that the sorting operators are temporary employees. The union contract requires that temporary employees be hired for one month at a time. Each temporary employee is hired to work 125 hours in the month.arrow_forwardThe manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 8 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: Interviewing: 95 minutes. • Hiring: 85 minutes. • Assessment: 125 minutes. • Separation Processing: 115 minutes. Employees in Personnel work 34-hour weeks with four weeks for vacation. Of the 34 hours, five are reserved for administrative tasks, training, and so on. The costs of the Personnel Department, including any allocated costs from other staff functions, are $1,503,360. During the year, Personnel conducted 1,250 Interviews, made 400 hires, made 4,000 assessments, and had 350 separations. The manager of the Personnel…arrow_forward
- Calzado Company produces leather shoes in batches. The shoes are produced in one plant located on 20 acres. The plant operates two shifts, five days per week. Each time a batch is produced, just-in-time suppliers deliver materials to the plant. When the materials arrive, a worker checks the quantity and type of materials with the bill of materials for the batch. The worker then makes an entry at a PC terminal near the point of delivery acknowledging receipt of the material. An accounts payable clerk reviews all deliveries at the end of each day and then prints and mails checks the same day materials are received. Prior to producing a batch, the equipment must be configured to reflect style and size features. Once configured, the batch is produced passing through three operations: cutting, sewing, and attaching buckles and other related parts such as heels.At the end of the production process, a sample of shoes is inspected to ensure the right level of quality. After inspection, the…arrow_forwardSifton Electronics Corporation manufactures and assembles electronic motor drives for video cameras. The company assembles the motor drives for several accounts. The process consists of a lean cell for each customer. The following information relates only to one customer's lean cell for the coming year. Projected labor and overhead, $5,297,500; materials costs, $32 per unit. Planned production included 5,216 hours to produce 16,300 motor drives. Actual production for August was 1,900 units, and motor drives shipped amounted to 1,400 units. From the foregoing information, determine the production costs transferred to Finished Goods during August. a.$678,300 b.$499,800 c.$619,432 d.$253,769arrow_forwardSifton Electronics Corporation manufactures and assembles electronic motor drives for video cameras. The company assembles the motor drives for several accounts. The process consists of a lean cell for each customer. The following information relates to only one customer's lean cell for the coming year. For the year, projected labor and overhead was $5,154,500 and materials costs were $34 per unit. Planned production included 5,408 hours to produce 16,900 motor drives. Actual production for August was 1,820 units, and motor drives shipped amounted to 1,400 units. Conversion costs are applied based on units of production From the foregoing information, determine the amount of the conversion costs charged to Raw and In Process Inventory during August. Oa. $555,100 Ob. $556,954 Oc. $235,349 Od. $128,100arrow_forward
- Sifton Electronics Corporation manufactures and assembles electronic motor drives for video cameras. The company assembles the motor drives for several accounts. The process consists of a lean cell for each customer. The following information relates to only one customer's lean cell for the coming year. For the year, projected labor and overhead was $5,105,700 and materials costs were $30 per unit. Planned production included 5,856 hours to produce 18,300 motor drives. Actual production for August was 1,950 units, and motor drives shipped amounted to 1,400 units. Conversion costs are applied based on units of production From the foregoing information, determine the cell conversion cost rate. a. $279.00 Ob. $3,646.93 Oc. $871.88 d. $2,618.31arrow_forwardiSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 21 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardSound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units. A batch of 45 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25 minutes. The…arrow_forward
- The manager of the Personnel Department at City Enterprises has been reading about time-driven ABC and wants to apply it to her department. She has identified four basic activities her employees spend most of the their time on: Interviewing, Hiring, Assessment, and Separation Processing. The department employs 13 staff who perform these activities. The manager provides the following estimates for the amount of time it takes to complete each of these activities: • Interviewing: 53 mìnutes. • Hiring: 68 minutes. • Assessment: 91 minutes. • Separation Processing: 98 minutes. Employees in Personnel work 43-hour weeks with four weeks for vacation. Of the 43 hours, five are reserved for administrative tasks, training, and so on. The costs of the Personnel Department, including any allocated costs from other staff functions, are $980,000. During the year, Personnel conducted 2,000 interviews, made 535 hies, made 4,600 assessments, ond had 290 separations. Required: a. What is the cost per…arrow_forwardSound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 18 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardSound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 21 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forward
- Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubFinancial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,