Concept explainers
Pratt Company produces two replacement parts for a popular line of Blu-ray disc players: Part A and Part B. Part A is made up of two components, one manufactured internally and one purchased from external suppliers. Part B is made up of three components, one manufactured internally and two purchased from suppliers. The company has two processes: fabrication and assembly. In fabrication, the internally produced components are made. Each component takes 20 minutes to produce. In assembly, it takes 30 minutes to assemble the components for Part A and 40 minutes to assemble the components for Part B. Pratt Company operates one shift per day. Each process employs 100 workers who each work eight hours per day.
Part A earns a unit contribution margin of $20, and Part B earns a unit contribution margin of $24 (calculated as the difference between revenue and the cost of materials and energy). Pratt can sell all that it produces of either part. There are no other constraints. Pratt can add a second shift of either process. Although a second shift would work eight hours, there is no mandate that it employ the same number of workers. The labor cost per hour for fabrication is $15, and the labor cost per hour for assembly is $12.
Required:
- 1. Identify the constraints facing Pratt, and graph them. How many binding constraints are possible? What is Pratt’s optimal product mix? What daily contribution margin is produced by this mix?
- 2. What is the drummer constraint? How much excess capacity does the other constraint have? Assume that a 1.5-day buffer inventory is needed to deal with any production interruptions. Describe the drum-buffer-rope concept using the Pratt data to illustrate the process.
- 3. Explain why the use of local labor efficiency measures will not work in Pratt’s TOC environment.
- 4. Suppose Pratt decides to elevate the binding constraint by adding a second shift of 50 workers (labor rates are the same as those of the first shift). Would elevation of Pratt’s binding constraint improve its system performance? Explain with supporting computations.
Want to see the full answer?
Check out a sample textbook solutionChapter 20 Solutions
Cornerstones of Cost Management (Cornerstones Series)
- Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 21 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardSound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 12 minutes to complete. The final assembly for each stereo unit requires 19 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The…arrow_forwardSound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units. A batch of 45 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25 minutes. The…arrow_forward
- Lead timeSound Tek Inc. manufactures electronic stereo equipment. Themanufacturing process includes printed circuit (PC) board assembly,final assembly, testing, and shipping. In the PC board assemblyoperation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator isresponsible for soldering components according to a given set ofinstructions. Operators work on batches of 45 printed circuit boards.Each board requires 5 minutes of board assembly time. After each batchis completed, the operator moves die assembled boards to the finalassembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 15 minutes and is alsodone in batches of 45 units. A batch of 45 stereos is moved into the testbuilding, which is across the street. The move takes 20 minutes. Beforeconducting the test, the test equipment must be set up for the particularstereo model. The test setup requires 25 minutes. The…arrow_forwardFrannie Fans currently manufactures ceiling fans that include remotes to operate them. The current cost to manufacture 10,020 remotes is as follows:arrow_forwardThe Glickman Electronics Company in Washington, DC produces two products: (1) the Glickman x-pod, a portable music player and (2) the Glickman BlueBerry, an internet-connected color telephone. The production process for each product is similar in that both require a certain number of hours of electronic work and a certain number of labor-hours in the assembly department. Each x=pod takes 4 hours of electronic work and 2 hours in the assembly shop. Each BlueBerry requires 3 hours in electronics and 1 hour in assembly. During the current production period, 240 hours of electronic time are available, and 100 hours of assembly department time are available. Each x-pod sold yields a profit of $7; each BlueBerry produced may be sold for a $5 profit. Glickman’s problem is to determine the best possible combination of x-pods and BlueBerrys to manufacture to reach the maximum profit.arrow_forward
- Vollmer Manufacturing makes three components for sale to refrigeration companies. The components are processed on two machines: a shaper and a grinder. The times (in minutes) required on each machine are as follows: The shaper is available for 120 hours, and the grinder for 110 hours. No more than 200 units of component 3 can be sold, but up to 1,000 units of each of the other components can be sold. In fact, the company already has orders for 600 units of component 1 that must be satisfied. The profit contributions for components 1, 2, and 3 are 8, 6, and 9, respectively. a. Formulate and solve for the recommended production quantities. b. What are the objective coefficient ranges for the three components? Interpret these ranges for company management. c. What are the right-hand-side ranges? Interpret these ranges for company management. d. If more time could be made available on the grinder, how much would it be worth? e. If more units of component 3 can be sold by reducing the sales price by 4, should the company reduce the price?arrow_forwardGray Fullbuster produces two different products (Square Ice Cube Trays and Round Ice Cube Trays) using two different activities: Machining, which uses machine hours as an activity driver, and Inspection, which uses number of batches as an activity driver. The activity rate for Machining is $170 per machine hour, and the activity rate for Inspection is $510 per batch. The activity drivers are used as follows: Machine hours Number of batches Square Ice Cube Trays 1,700 51 Round Ice Cube Trays 3,400 18 Total 5,100 69 What is the amount of Inspection cost assigned to Square Ice Cube Trays? Multiple Choice $26,010 $9,180 $289,000 $35,190arrow_forwardLead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 20 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 16 minutes and is also done in batches of 20 units. A batch of 20 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25…arrow_forward
- Lead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 20 printed circuit boards. Each board requires 5 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 16 minutes and is also done in batches of 20 units. A batch of 20 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25…arrow_forwardLead Time iSounds Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly, final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 9 minutes to complete. The final assembly for each stereo unit requires 18 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30…arrow_forwardPlata Company produces two products: a mostly handcrafted soft leather briefcase sold under the label Maletin Elegant and a leather briefcase produced largely through automation and sold under the label Maletin Fina. The two products use two overhead activities, with the following costs: Setting up equipment $ 3,000 Machining 19,000 The controller has collected the expected annual prime costs for each briefcase, the machine hours, the setup hours, and the expected production. Elegant Fina Direct labor $9,000 $3,000 Direct materials $3,000 $3,000 Units 3,000 3,000 Machine hours 500 4,500 Setup hours 100 100 Required Calculate the consumption ratios for each activity. Round your answers to one decimal place. Elegant Fina Machining fill in the blank 2 fill in the blank 3 Setups fill in the blank 4 fill in the blank 5 a. Calculate the overhead cost per unit for each briefcase by using a plantwide rate based on direct labor costs. Round to the…arrow_forward
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningEssentials of Business Analytics (MindTap Course ...StatisticsISBN:9781305627734Author:Jeffrey D. Camm, James J. Cochran, Michael J. Fry, Jeffrey W. Ohlmann, David R. AndersonPublisher:Cengage LearningManagerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College Pub