Calculating overallocated or underallocated overhead (Learning Objective 5)
Well-Flow Company had estimated $1,053,000 of manufacturing overhead (MOH) for the year and 58,500 direct labor (DL) hours, resulting in a predetermined MOH rate of $18 per DL hour. By the end of that year, the company had actually incurred $1,005,000 of MOH costs and had used a total of 57,000 DL hours on various jobs.
- 1. By how much did the company overallocate or underallocate MOH for the year?
- 2. Was MOH overallocated or underallocated for the year? How do you know?
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
I have the following information: direct materials $250 and total manufacturing cost $700. Overhead applied to jobs at a rate of 200% of direct labor cost. This is for Chapter 2 job costing in managerial accounting. I am supposed to figure out conversion cost, direct labor cost, and manufacturing overhead.
I know the formula for conversion cost= direct labor + manufacturing OH
Prime cost= direct labor + direct materials
How do I figure out direct labor cost with the given information? The learning objective states calcualte predetermined overhead rate, but I do not have estimated manufacturing cost and estimated labor. Can you please help?
Thanks,
Erica Gordon
Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.
to complete the first setup on a new machine took an employee 250 minutes. using 72%
cumulative average - time learning curve indicated that the second setup on the new
machine is expected to take. answer choices: a.) 110 minutes b.) 90 minutes c.) 180
minutes d.) 215 minutes
Chapter 3 Solutions
Managerial Accounting (5th Edition)
Ch. 3 - (Learning Objective 1) For which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 3) The amount of manufacturing...Ch. 3 - (Learning Objective 4) Which of the following is...Ch. 3 - (Learning Objective 5) Which of the following is...Ch. 3 - (Learning Objective 5) Assuming the amount of...Ch. 3 - Prob. 8QCCh. 3 - Prob. 9QCCh. 3 - Prob. 10QC
Ch. 3 - Identify product costs, period costs, and product...Ch. 3 - Decide on product costing system (Learning...Ch. 3 - Determine the flow of costs between inventory...Ch. 3 - Understanding key document terms in a job cost...Ch. 3 - Compute a professional billing rate (Learning...Ch. 3 - Prob. 3.6SECh. 3 - Continuation of S3-6: compute total allocated...Ch. 3 - Continuation of S3-7: determine over- or under...Ch. 3 - Prob. 3.9SECh. 3 - Calculate job cost and billing at appliance repair...Ch. 3 - Calculating overallocated or underallocated...Ch. 3 - Prob. 3.12SECh. 3 - Record manufacturing labor costs (Learning...Ch. 3 - Prob. 3.14SECh. 3 - Prob. 3.15SECh. 3 - Understanding key terms (Learning Objectives 1, 2,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Prob. 3.18AECh. 3 - Determine the cost of a job and use it for pricing...Ch. 3 - Compute a predetermined overhead rate and...Ch. 3 - Prob. 3.21AECh. 3 - Prob. 3.22AECh. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Job cost and bid price at a consulting firm...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Understand the flow of costs in a job cost shop...Ch. 3 - Prob. 3.33BECh. 3 - Prob. 3.34BECh. 3 - Prob. 3.35BECh. 3 - Sustainability and job costing (Learning...Ch. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Prob. 3.43BECh. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Job costing or process costing for wedding...Ch. 3 - Discussion Questions 1. Why would it be...Ch. 3 - Unwrapped or How Its Made Go to www.YouTube.com...Ch. 3 - Ethics involved with choice of cost driver...Ch. 3 - Prob. 3.61ACTCh. 3 - Issues with cost of job (Learning Objectives 2, 3,...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardAverage labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be: a. 80% and RO 36.000 b. 90% and RO 40.500 c. 85% and RO 38.250 d. 95% and RO 42.750arrow_forwardLearning CurveBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On aver-age, the first unit of a new design takes 600 hours. Direct labor is paid $25 per hour. Required:1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total pro-duction of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours,…arrow_forward
- Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: (Click icon to view data) Requirement Calculate the total variable costs of producing 2, 4, and 8 units. Begin by calculating the cumulative total time in labor-hours using the cumulative average-time learning model. (Round the cumulative average time per unit to the nearest whole number.) Cumulative number of Cumulative average time Cumulative total time: per unit: Labor-hours Labor-hours 3700 units 2 4 8 3700 ← Data table Direct material cost Direct manufacturing labor time for first unit Learning curve for manufacturing labor time per radar system Direct manufacturing labor cost Variable manufacturing overhead cost Using the formula for an 85% learning curve, b = In 0.85 In 2 Print = $ $ $ -0.162519 0.693147 81,000 per unit of RS-32 3,700 direct manufacturing labor-hours 85% cumulative average timeª Done 28 per direct…arrow_forwardThe following information is provided to you: Time taken to produce first 8 shock pads 640 hours Time taken to produce first 16 shock pads 1200 hours Calculate the learning curve The following information is provided to you: Direct labour needed to make first machine. 1000 hoursLearning curve. 80%Direct labour cost. R300 per hourDirect materials cost. R180000 per machine Fixed cost for machines at each cumulative production R800000 Calculate the total direct hours required to manufacture four (4) machines. ( Indicate both average time per unit as well as cumulative time per unit for all theunits) Calculate the total costs to manufacture 4 machinesarrow_forwardCanfield Technical School allocates administrative costs to its respective departments based on the number of students enrolled, while maintenance and utility costs are allocated based on the square footage of each department's classroom. Based on the information below, what is the total amount of administrative cost to the Accounting Department (rounded to the nearest dollar) if administrative costs for the school were $56,000, maintenance fees were $12,600, and utilities were $6,300? Department Electrical Students 126 Classroom Square Feet 10,300 Welding 73 12,300 Accounting 53 8,300 Carpentry 43 6,300 Total 295 37,200arrow_forward
- The XYY Company has received an initial order for four of its products (WW500). The information about products as follows: - Direct material cost per (WW500) $ 200,000 - Direct- assembly labor time for first (WW500) 4,000 labor-hours - Learning curve for assembly labor time per (WW500) 80% cumulative average time - Direct -assembly labor cost $ 50 per hour - Equipment-related indirect manufacturing cost $ 40 per direct-assembly labor-hour - Material-handling-related indirect manufacturing cost 40% of direct material cost - Setup-related indirect manufacturing cost 10% of prime cost -Inspection-related indirect manufacturing cost 20% of direct labor - Fixed overhead cost $ 200,000 - b = –0.25 Required How many direct-assembly labor-hours are required to assemble the first four products? What is the total cost of assembling the first four products? What is the total cost of assembling the Third product? What is the total cost of assembling the eight products, assuming…arrow_forwardThe following scenario relates to 5 questions. Bear Co has developed a new model of television. The estimated labour time for the first unit is 12 hours but a learning curve of 75% is expected to apply for the first eight units produced Note: The learning index for a 75% learning curve is -0.415. Overhead production costs must be estimated based on a previous model, the Leonardo, that was made by Bear Co. Production quantities and total overhead costs for the last four months of production of the Leonardo were as follows: Month Output Total overhead cost (units) $ September 1,800 278,200 October 2,000 310,000 November 1,700 252,900 December 200,000 1,000 You have been asked to estimate the variable overhead cost per unit of the new television by assuming that it will be the same as for the Leonardo, using the information provided for the last four months of its manufacture, and applying a 6% inflation rate. What is the variable cost per unit using the high-low method (to two decimal…arrow_forwardThe following scenario relates to 5 questions. Bear Co has developed a new model of television. The estimated labour time for the first unit is 12 hours but a learning curve of 75% is expected to apply for the first eight units produced Note: The learning index for a 75% learning curve is-0-415. Overhead production costs must be estimated based on a previous model, the Leonardo, that was made by Bear Co. Production quantities and total overhead costs for the last four months of production of the Leonardo were as follows: Month Output Total overhead cost (units) $ September 1,800 278,200 October 2,000 310,000 November 1,700 252,900 December 1,000 200,000 The first phase of production has now been completed for the new television. The first unit actually took 12-5 hours to make and the total time for the first eight units was 34-3 hours, at which point the learning effect came to an end. What is the actual learning rate, and did the labour force learn more quickly or less quickly than…arrow_forward
- Strong Company applies overhead based on machine hours. At the beginning of 20x1, the company estimated that manufacturing overhead would be $500,000, and machine hours would total 20,000. By 20x1 year-end, actual overhead totaled $525,000, and actual machine hours were 25,000. On the basis of this information, the 20x1 predetermined overhead rate was: Select one: a. $0.04 per machine hour b. $0.05 per machine hour c. $20 per machine hour d. $21 per machine hour e. S25 per machine hourarrow_forwardDuring the current year, Pitt Company incurred costs to develop and produce a routine, low-risk computer software product. 1,300,000 Completion of detailed program design Costs incurred for coding and testing to establish technological feasibility Other coding costs after establishment of technological feasibility Other testing costs after establishment of technological feasibility Costs of producing product masters for training materials Duplication of computer software and training materials from product masters (1,000 units) Packaging product (500 units) 3. In the year-end statement of financial position, what amount should be capitalized as software cost? 1,000,000 2,400,000 2,000,000 1,500,000 2,500,000 900,000 a. 5,400,000 b. 5,700,000 c. 5,900,000 d. 6,900,000arrow_forwardHarriman Industries manufactures engines for the aerospace industry. It has completed manufacturing the first unit of the new ZX-9 engine design. Management believes that the 1,000 labor hours required to complete this unit are reasonable and is prepared to go forward with the manufacture of additional units. An 80 percent cumulative average-time learning curve model for direct labor hours is assumed to be valid. Data on costs are as follows: Required: 1. Set up a table with columns for cumulative number of units, cumulative average time per unit in hours, and the cumulative total time in hours. Complete the table for 1, 2, 4, 8, 16, and 32 units. (Round hours to one significant digit.) 2. What are the total variable costs of producing 1, 2, 4, 8, 16, and 32 units? What is the variable cost per unit for 1, 2, 4, 8, 16, and 32 units?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Cost Accounting - Definition, Purpose, Types, How it Works?; Author: WallStreetMojo;https://www.youtube.com/watch?v=AwrwUf8vYEY;License: Standard YouTube License, CC-BY