Chapter 3, Problem 3.39BE
Analyze manufacturing overhead (Learning Objectives 3 & 5)
Benson Foundry in Charleston, South Carolina, uses a predetermined manufacturing overhead rate to allocate overhead to individual jobs based on the machine hours required. At the beginning of the year, the company expected to incur the following:
$ 610,000 | |
Direct labor cost | $15,00,000 |
Machine hours | 76,250 |
At the end of the year, the company had actually incurred the following:
Direct labor cost | $1,220,000 |
$ 470,000 | |
Property taxes on plant | $ 19,000 |
Sales salaries | $ 25,500 |
Delivery drivers’ wages | $ 14,500 |
Plant janitors’ wages | $ 8,000 |
Machine hours | 55,500 hours |
Requirements
- 1. Compute Benson Foundry’s predetermined manufacturing overhead rate.
- 2. How much manufacturing overhead was allocated to jobs during the year?
- 3. How much manufacturing overhead was incurred during the year? Is manufacturing overhead underallocated or overallocated at the end of the year? By how much?
- 4. Were the jobs overcosted or undercosted? By how much?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow:
(Click icon to view data)
Requirement
Calculate the total variable costs of producing 2, 4, and 8 units.
Begin by calculating the cumulative total time in labor-hours using the cumulative average-time learning model. (Round the cumulative average time per unit to the nearest whole number.)
Cumulative number of Cumulative average time
Cumulative total time:
per unit: Labor-hours
Labor-hours
3700
units
2
4
8
3700
←
Data table
Direct material cost
Direct manufacturing labor time for first unit
Learning curve for manufacturing labor time per radar system
Direct manufacturing labor cost
Variable manufacturing overhead cost
Using the formula for an 85% learning curve, b =
In 0.85
In 2
Print
=
$
$
$
-0.162519
0.693147
81,000 per unit of RS-32
3,700 direct manufacturing labor-hours
85% cumulative average timeª
Done
28 per direct…
In Class Assignment 1
AlSaleh has assigned overhead on a plantwide basis to its two products (Tables and Chairs) using
direct labor hours which are estimated to be 200,000 for the current year. The company has decided
to experiment with activity-based costing and has created two activity cost pools and related
activity cost drivers. These two cost pools are Ordering and receiving (cost driver is Purchase
orders) and machine setup (cost driver is number of setups). Overhead allocated to the ordering
and receiving cost pool is $200,000, and $800,000 is allocated to the machine setup cost pool.
Additional information related to these pools is as follows:
Cost Drivers
Tables
Chairs
Purchase orders
30,000
10,000
number of setups
10,000
30,000
a. Determine the amount of overhead assigned to the table product line and the chairs product
line using activity-based costing.
b. What amount of overhead would be assigned to the tables and chairs product lines using
the traditional approach,…
Carla Vista Limited is a company that produces machinery to customer orders, using a normal job-order cost system. It applies
manufacturing overhead to production using a predetermined rate. This overhead rate is set at the beginning of each fiscal year by
forecasting the year's overhead and relating it to direct labour costs. The budget for 2022 was as follows:
Direct labour
Manufacturing overhead
$1,804,000
902,000
As at the end of the year, two jobs were incomplete. These were 1768B, with total direct labour charges of $113,600, and 1819C, with
total direct labour charges of $390,100. Machine hours were 287 hours for 17688 and 647 hours for 1819C. Direct materials issued
for 1768B amounted to $220,000, and for 1819C they amounted to $420,500.
Total charges to the Manufacturing Overhead Control account for the year were $898,500, and direct labour charges made to all jobs
amounted to $1,583,600, representing 247,500 direct labour hours.
There were no beginning inventories. In…
Chapter 3 Solutions
Managerial Accounting (5th Edition)
Ch. 3 - (Learning Objective 1) For which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 2) Which of the following...Ch. 3 - (Learning Objective 3) The amount of manufacturing...Ch. 3 - (Learning Objective 4) Which of the following is...Ch. 3 - (Learning Objective 5) Which of the following is...Ch. 3 - (Learning Objective 5) Assuming the amount of...Ch. 3 - Prob. 8QCCh. 3 - Prob. 9QCCh. 3 - Prob. 10QC
Ch. 3 - Identify product costs, period costs, and product...Ch. 3 - Decide on product costing system (Learning...Ch. 3 - Determine the flow of costs between inventory...Ch. 3 - Understanding key document terms in a job cost...Ch. 3 - Compute a professional billing rate (Learning...Ch. 3 - Prob. 3.6SECh. 3 - Continuation of S3-6: compute total allocated...Ch. 3 - Continuation of S3-7: determine over- or under...Ch. 3 - Prob. 3.9SECh. 3 - Calculate job cost and billing at appliance repair...Ch. 3 - Calculating overallocated or underallocated...Ch. 3 - Prob. 3.12SECh. 3 - Record manufacturing labor costs (Learning...Ch. 3 - Prob. 3.14SECh. 3 - Prob. 3.15SECh. 3 - Understanding key terms (Learning Objectives 1, 2,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Prob. 3.18AECh. 3 - Determine the cost of a job and use it for pricing...Ch. 3 - Compute a predetermined overhead rate and...Ch. 3 - Prob. 3.21AECh. 3 - Prob. 3.22AECh. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Job cost and bid price at a consulting firm...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Identify type of costing system (Learning...Ch. 3 - Understand the flow of costs in a job cost shop...Ch. 3 - Prob. 3.33BECh. 3 - Prob. 3.34BECh. 3 - Prob. 3.35BECh. 3 - Sustainability and job costing (Learning...Ch. 3 - Determine the cost of a job (Learning Objectives...Ch. 3 - Compare bid prices under two different allocation...Ch. 3 - Analyze manufacturing overhead (Learning...Ch. 3 - Record manufacturing overhead (Learning Objectives...Ch. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze T-accounts (Learning Objectives 2, 3, 5, ...Ch. 3 - Prob. 3.43BECh. 3 - Record journal entries (Learning Objectives 2, 3,...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Analyze Manufacturing Overhead (Learning...Ch. 3 - Use job costing at an advertising agency (Learning...Ch. 3 - Use job costing at a consulting firm (Learning...Ch. 3 - Prepare job cost record (Learning Objectives 2, 3,...Ch. 3 - Determine and record job costs (Learning...Ch. 3 - Determine flow of costs through accounts (Learning...Ch. 3 - Job costing or process costing for wedding...Ch. 3 - Discussion Questions 1. Why would it be...Ch. 3 - Unwrapped or How Its Made Go to www.YouTube.com...Ch. 3 - Ethics involved with choice of cost driver...Ch. 3 - Prob. 3.61ACTCh. 3 - Issues with cost of job (Learning Objectives 2, 3,...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardHarriman Industries manufactures engines for the aerospace industry. It has completed manufacturing the first unit of the new ZX-9 engine design. Management believes that the 1,000 labor hours required to complete this unit are reasonable and is prepared to go forward with the manufacture of additional units. An 80 percent cumulative average-time learning curve model for direct labor hours is assumed to be valid. Data on costs are as follows: Required: 1. Set up a table with columns for cumulative number of units, cumulative average time per unit in hours, and the cumulative total time in hours. Complete the table for 1, 2, 4, 8, 16, and 32 units. (Round hours to one significant digit.) 2. What are the total variable costs of producing 1, 2, 4, 8, 16, and 32 units? What is the variable cost per unit for 1, 2, 4, 8, 16, and 32 units?arrow_forwardMary Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed below: Maintenance 200,000.00 Material handling 32,000.00 Setups 100,000.00 Inspection 120,000.00 Currently, overhead is applied using a predetermined overhead rate, based on 80% of direct labor. The company has been asked to submit a bid for a proposed job. The plant manager feels that getting this job would result in new business in future years. Bids are based on full manufacturing cost plus 20 percent. Estimates for the proposed job are as follows: Direct materials 6,000.00 Direct labor (1k hours) 10,000.00 No. of materials moves 12.00 No. of inspections 10.00 No. of setups 2.00 No. of machine hours 500.00 In the past, full manufacturing cost has been calculated using normal costing. The plant manager has heard of a new way of applying overhead that…arrow_forward
- Mary Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed below: Maintenance 200,000.00 Material handling 32,000.00 Setups 100,000.00 Inspection 120,000.00 Currently, overhead is applied using a predetermined overhead rate, based on 80% of direct labor. The company has been asked to submit a bid for a proposed job. The plant manager feels that getting this job would result in new business in future years. Bids are based on full manufacturing cost plus 20 percent. Estimates for the proposed job are as follows: Direct materials 6,000.00 Direct labor (1k hours) 10,000.00 No. of materials moves 12.00 No. of inspections 10.00 No. of setups 2.00 No. of machine hours 500.00 In the past, full manufacturing cost has been calculated using normal costing. The plant manager has heard of a new way of applying overhead that…arrow_forwardMary Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed below: Maintenance 200,000.00 Material handling 32,000.00 Setups 100,000.00 Inspection 120,000.00 Currently, overhead is applied using a predetermined overhead rate, based on 80% of direct labor. The company has been asked to submit a bid for a proposed job. The plant manager feels that getting this job would result in new business in future years. Bids are based on full manufacturing cost plus 20 percent. Estimates for the proposed job are as follows: Direct materials 6,000.00 Direct labor (1k hours) 10,000.00 No. of materials moves 12.00 No. of inspections 10.00 No. of setups 2.00 No. of machine hours 500.00 In the past, full manufacturing cost has been calculated using normal costing. The plant manager has heard of a new way of applying overhead that…arrow_forwardMary Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed below: Maintenance 200,000.00 Material handling 32,000.00 Setups 100,000.00 Inspection 120,000.00 Currently, overhead is applied using a predetermined overhead rate, based on 80% of direct labor. The company has been asked to submit a bid for a proposed job. The plant manager feels that getting this job would result in new business in future years. Bids are based on full manufacturing cost plus 20 percent. Estimates for the proposed job are as follows: Direct materials 6,000.00 Direct labor (1k hours) 10,000.00 No. of materials moves 12.00 No. of inspections 10.00 No. of setups 2.00 No. of machine hours 500.00 In the past, full manufacturing cost has been calculated using normal costing. The plant manager has heard of a new way of applying overhead that…arrow_forward
- Mary Manufacturing has four categories of overhead. The four categories and expected overhead costs for each category for next year are listed below: Maintenance 200,000.00 Material handling 32,000.00 Setups 100,000.00 Inspection 120,000.00 Currently, overhead is applied using a predetermined overhead rate, based on 80% of direct labor. The company has been asked to submit a bid for a proposed job. The plant manager feels that getting this job would result in new business in future years. Bids are based on full manufacturing cost plus 20 percent. Estimates for the proposed job are as follows: Direct materials 6,000.00 Direct labor (1k hours) 10,000.00 No. of materials moves 12.00 No. of inspections 10.00 No. of setups 2.00 No. of machine hours 500.00 In the past, full manufacturing cost has been calculated using normal costing. The plant manager has heard of a new way of applying overhead that…arrow_forward?Refer to CASE 2 (Company B), What is the expected Product Margin of product Z if activity-based costing is used None of the amounts given .a O $101,250 b O $62,000 .c O $23,000 .d Oarrow_forwardesc Chain Reaction, Inc. allocates overhead using machine hours as the allocation activity. The following information was estimated at the beginning of the year: $300,000 of Estimated Manufacturing Overhead 10,000 Estimated Machine Hours 20,000 Estimated Direct Labor Hours During the year, it took 2,000 machine hours and 6,000 direct labor hours to produce the mountain bikes. How much manufacturing overhead was allocated to the mountain bikes during the year? Click Save and Submit to save and submit. Click Save All Answers to save all answers. 1 Q A 2 W S #3 E D $ 4 R % dlo L 5 F MacBook Pro T < 6 G & Y 7 H * 00 8 U J garrow_forward
- Blossom Limited is a company that produces machinery to customer orders, using a normal job-order cost system. It applies manufacturing overhead to production using a predetermined rate. This overhead rate is set at the beginning of each fiscal year by forecasting the year’s overhead and relating it to direct labour costs. The budget for 2022 was as follows: Direct labour $1,800,000 Manufacturing overhead 900,000 As at the end of the year, two jobs were incomplete. These were 1768B, with total direct labour charges of $110,000, and 1819C, with total direct labour charges of $390,000. Machine hours were 287 hours for 1768B and 647 hours for 1819C. Direct materials issued for 1768B amounted to $220,000, and for 1819C they amounted to $420,000.Total charges to the Manufacturing Overhead Control account for the year were $897,000, and direct labour charges made to all jobs amounted to $1,573,600, representing 247,200 direct labour hours.There were no beginning inventories. In…arrow_forwardAt the beginning of the year, Jones Manufacturing Company predicts total overhead costs in the amount of $896,000. The company applies overhead using machine-hours and estimates that it will use 32,000 machine-hours during the upcoming year. REQUIRED: What amount of overhead should be applied to Job 14A if that job uses 40 machine-hours? A) $1,120 B) $1,140 C) $2,240 D) $3,360arrow_forwardHartley Uniforms produces uniforms. The company allocates manufacturing overhead based on the machine hours each job uses. Hartley Uniforms reports the following cost data for the past year: E (Click the icon to view the cost data.) Read the requirements. Data table Requirement 1. Compute the predetermined manufacturing overhead rate. Enter the formula for predetermined manufacturing overhead rate, then compute the rate. Budget Actual Estimated yearly overhead costs Estimated yearly machine hours Predetermined overhead rate Direct labor hours. 7,600 hours 6,100 hours 194,400 7,200 $ 27 per machine hour Machine hours. 7,200 hours 6,300 hours Requirement 2. Calculate the allocated manufacturing overhead for the past year. Depreciation on salespeople's autos 23,000 $ 23,000 Indirect materials.. $ 48,500 $ 50,500 Manufacturing Depreciation on trucks used to deliver uniforms to customers $ 13,000 $ 11,000 Actual machine hours Predetermined overhead rate overhead allocated Depreciation on…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Cost Accounting - Definition, Purpose, Types, How it Works?; Author: WallStreetMojo;https://www.youtube.com/watch?v=AwrwUf8vYEY;License: Standard YouTube License, CC-BY