Choosing an Activity-Based Costing System
Pickle Motorcycles, Inc. (PMI), manufactures three motorcycle models: a cruising bike (Route 66), a street bike (Main Street), and a starter model (Alley Cat). Because of the different materials used, production processes for each model differ significantly in terms of machine types and time requirements. Once parts are produced, however, assembly time per unit required for each type of bike is similar. For this reason, PMI allocates
PMI’s chief financial officer (CFO) hired a consultant to recommend cost allocation bases. The consultant recommended the following:
The consultant found no basis for allocating the plant administration and other fixed overhead costs and recommended that these not be applied to products.
Required
- a. Using machine-hours to allocate production overhead, complete the income statement for Pickle Motorcycles. (See the “using energy” activity for machine-hours.) Do not attempt to allocate plant administration or other fixed overhead.
- b. Complete the income statement using the bases recommended by the consultant.
- c. How might activity-based costing result in better decisions by Pickle Motorcycles’s management?
- d. After hearing the consultant’s recommendations, the CFO decides to adopt activity-based costing but expresses concern about not allocating some of the overhead to the products (plant administration and other fixed overhead). In the CFO’s view, “Products have to bear a fair share of all overhead or we won’t be covering all of our costs.” How would you respond to this comment?
a.
Complete the income statement.
Explanation of Solution
Traditional labor-hour based costing method:
Traditional labor-hour based costing method assumes that the direct labor-hour is the base allocation of the process. The process of allocation of overhead computes the indirect overhead with respect to the labor-hours only.
Complete the income statement:
Particulars | Route 66 | Main street | Alley cat | Total |
Sales revenue | $7,600,000 | $11,200,000 | $9,500,000 | $28,300,000 |
Direct costs: | ||||
Direct materials | $3,000,000 | $4,800,000 | $4,000,000 | $11,800,000 |
Direct labor | $288,000 | $480,000 | $1,080,000 | $1,848,000 |
Variable overhead | $939,600 | $1,503,360 | $2,255,040 | $4,698,000 |
Contribution margin | $3,372,400 | $4,416,640 | $2,164,960 | $9,954,000 |
Fixed overhead: | ||||
Plant admin | $1,760,000 | |||
Other | $2,800,000 | |||
Gross profit | $5,394,000 |
Table: (1)
Compute the rate of variable overhead:
Thus, the rate of variable overhead is $93.96.
b.
Complete the income statement using the recommendations.
Explanation of Solution
Activity-based costing (ABC):
Activity-based costing is the method of costing where the overhead cost is assigned to various products. This method of costing establishes the relationship between the manufacturing overhead costs and the activities. The relationship is then implemented for the allocation of indirect costs to the products.
Complete the income statement using the recommendations:
Particulars | Route 66 | Main street | Alley cat | Total |
Sales revenue | $7,600,000 | $11,200,000 | $9,500,000 | $28,300,000 |
Direct costs: | ||||
Direct materials | $3,000,000 | $4,800,000 | $4,000,000 | $11,800,000 |
Direct labor | $288,000 | $480,000 | $1,080,000 | $1,848,000 |
Variable overhead | ||||
Machine setup | $102,960 | $159,120 | $205,920 | $468,000 |
Order processing | $288,000 | $432,000 | $432,000 | $1,152,000 |
Warehousing | $418,500 | $418,500 | $837,000 | $1,674,000 |
Energy | $151,200 | $241,920 | $362,880 | $756,000 |
Shipping | $43,200 | $172,800 | $432,000 | $648,000 |
Contribution margin | $3,308,140 | $4,495,660 | $2,150,200 | $9,954,000 |
Fixed overhead | ||||
Plant admin | $1,760,000 | |||
Other | $2,800,000 | |||
Gross profit | $5,394,000 |
Table: (2)
Compute the applicable rate:
Particulars | Total cost | Total respective units | Applicable rate |
Machine setup | $468,000 | 100 | $4,680 |
Order processing | $1,152,000 | 1,600 | $720 |
Warehousing | $1,674,000 | 800 | $2,093 |
Energy | $756,000 | 50,000 | $15 |
Shipping | $648,000 | 15,000 | $43 |
Table: (3)
c.
Determine how activity-based costing result is better.
Explanation of Solution
Activity-based costing (ABC):
Activity-based costing is the method of costing where the overhead cost is assigned to various products. This method of costing establishes the relationship between the manufacturing overhead costs and the activities. The relationship is then implemented for the allocation of indirect costs to the products.
Traditional labor-hour based costing method:
Traditional labor-hour based costing method assumes that the direct labor-hour is the base allocation of the process. The process of allocation of overhead computes the indirect overhead with respect to the labor-hours only.
The relevance of ABC method:
The ABC method gives a better and detailed cost structure of the process. A better cost report will provide a better assessment of the costing. The information that is churned out enables the management to take appropriate decisions.
d.
Provide the appropriate response to the statement in question.
Explanation of Solution
Activity-based costing (ABC):
Activity-based costing is the method of costing where the overhead cost is assigned to various products. This method of costing establishes the relationship between the manufacturing overhead costs and the activities. The relationship is then implemented for the allocation of indirect costs to the products.
The statement in question:
“Products have to bear a fair share of all overhead, or we won’t be covering all of our costs.”
The relevance of statement with respect to the ABC:
There are few costs that do not correlate with volume or any other base of activity. Allocation of such costs would make information distorted. Preferable means to record these costs would require determination of contribution margin from each product.
Want to see more full solutions like this?
Chapter 9 Solutions
Fundamentals Of Cost Accounting (6th Edition)
- Hi Tech Products manufactures three (3) types of CD players: Cheap, Econo and Deluxe. Hi Tech uses an activity-based product costing system. The company has identified five (5) activities. Each activity, its cost and related activity driver are identified below: Under an activity-based product costing system, what is the cost per unit of Cheap?arrow_forwardJulio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Standard Model Deluxe Model Number of machine hours 25,800 30,800 Number of material moves Number of setups 590 890 70 540 Total estimated overhead costs are $347,100, of which $170,200 is assigned to the material handling cost pool and $176,900 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC.arrow_forwardJulio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Standard Model Deluxe Model Number of machine hours 26,500 31,500 Number of material moves 625 925 Number of setups 85 575 Total estimated overhead costs are $382,020, of which $186,000 is assigned to the material handling cost pool and $196,020 is assigned to the setup cost pool Im not understadning how to find the over head costsarrow_forward
- Chrzan, Incorporated, manufactures and sells two products: Product EO and Product NO. Data concerning the expected production of each product and the expected total direct labor-hours (DLHs) required to produce that output appear below: Product E0 Product Ne Total direct labor-hours Activity Cost Pools Labor-related Production orders Order size The company is considering adopting an activity-based costing system with the following activity cost pools, activity measures, and expected activity: Estimated Overhead Cost Multiple Choice $33.94 per MH $54.20 per MH Direct Expected Labor-Hours Production Per Unit 10.1 410 1,550 9.1 $51.98 per MH $21.40 per MH Activity Measures DLHS orders MHs Total Direct Labor- Hours $ 301,890 61,087 585,366 $948,343 The activity rate for the Order Size activity cost pool under activity-based costing is closest to: 4,141 14, 105 18,246 Product E 4,141 850 5,550 Expected Activity Product NO 14, 105 950 5,250 Total 18,246 1,800 10,800arrow_forwardComparing costs from ABC and single-rate systems Harcourt Pharmaceuticals manufactures an over—the counter allergy medication. The company sells both large commercial containers of 1,000 capsules to health care facilities and travel packs of 20 capsules to shops in airports, train stations, and hotels. The following information has been developed to determine if an activity-based costing system would be beneficial: Other production information includes the following: Requirements Harcourt’s original single plantwide overhead allocation rate system allocated indirect costs to products at $140.00 per machine hour. Compute the total indirect costs allocated to the commercial containers and to the travel packs under the original system. Then compute the indirect cost per unit for each product. Round to two decimal places. Compute the predetermined overhead allocation rate for each activity. Use the predetermined overhead allocation rates to compute the activity-based costs per unit of the…arrow_forwardThe KMP Metal Machining Company produces widgets according to customer order. The company has determined that widgets can be produced on three different machine tools: M1, M2, or M3. An analysis of widget production cost reveals the following data: Solve, a. Using a graphical approach, determine the most economical machine tool to use for all order sizes between 1 and 200 units. In other words, determine the subranges within the overall range of 1 to 200 for which each machine tool is preferred. b. Using an algebraic approach, determine the most economical machine tool to use for all order sizes between 1 and 200 units. c. For an order of size 75, which machine tool should be used to produce the order, and what is the total production cost? d. For an order of size 160, assume that the preferred (most economical) machine is unavailable. What penalty (expressed in dollars of additional production cost) must be paid if the second most economical machine is used? The third?arrow_forward
- Julio produces two types of calculator, standard and deluxe. The company is currently using a traditional costing system with machine hours as the cost driver but is considering a move to activity-based costing. In preparing for the possible switch, Julio has identified two cost pools: materials handling and setup. The collected data follow: Number of machine hours Number of material moves Number of setups Total estimated overhead costs are $332,860, of which $158,400 is assigned to the material handling cost pool and $174,460 is assigned to the setup cost pool. Required: 1. Calculate the overhead assigned to each product using the traditional cost system. 2. Calculate the overhead assigned to each product using ABC. Required 1 Required 2 Standard Model Deluxe Model 30,400 870 520 Complete this question by entering your answers in the tabs below. Standard Model Deluxe Model 25,400 570 90 Calculate the overhead assigned to each product using the traditional cost system. (Round the…arrow_forwardFountain Water Products (FWP) manufacturers water bottles. They have historically used a traditional system that allocated the manufacturing overhead costs based on machine hours. FWP is looking at switching to an ABC system in order to ensure more accurate product costing. They first want to compare the traditional and ABC costing systems to determine if it is worth the effort and costs to implement and maintain. They estimate a total overhead cost of $459,000. Under the traditional system they identified machine hours as the cost driver, and estimated a total of 51,000 machine hours. They actually incurred 48,700 machine hours in production. The total applied MOH calculated under the more precise ABC system was $320,000. The ABC costing system will cost $50,000 to implement. FWP has determined that a benefit of more accurate costing by $80,000 is worth the $50,000 implementation cost. What is the difference between the ABC costing and traditional system? Enter your number as a…arrow_forwardMove Corporation manufactures two models of motorized go-carts, a standard and a deluxe model. The following activity and cost information has been compiled: Number of Number of Number of Product Setups Components Direct Labor Hours Standard 15 10 750 Deluxe 35 15 500 Overhead costs $16,500 $23,500 Number of setups and number of components are identified as activity-cost drivers for overhead. Assuming an activity-based costing system is used, what is the total amount of overhead cost assigned to the standard model?arrow_forward
- Conspicuous Limo uses activity-based costing for its two models of stretch Hummer limousines: Big and Too Big. There are three activity cost pools related to production, with estimated costs and expected activity as follows: Amount of Activity Activity Cost Pool Estimated Cost Activity cost driver Big Too Big Fabrication $181,500 Labor hours 600 500 Painting $650,000 Machine hours 1,600 300 Finishing $2,750,000 Units 470 530 Using the activity proportion method, how much of the finishing cost would be assigned to the Too Big model?arrow_forwardHelpful Division of X Company makes two products, Small and Large. The company has always used Conventional Costing (for financial reporting purposes), but this period wants to try using Activity-Based Costing to make better decisions. Information related to the current period is as follows: REQUIRED: (#1) Since the company has three activities, what are the three overhead application rates the company would use for activity-based costing? (ROUND EACH RATE TO THE NEAREST CENT and be sure to label the rates appropriately.) (#2) Using activity-based costing, what was the cost to manufacture one Small unit? (#3) Using activity-based costing, what was the cost to manufacture one Large unit? (#4) Based on what you learned about activity-based costing this week, how might Helpful Division managers use the new cost information from its activity-based costing system to better manage its operations? Helpful Resource: https://www.youtube.com/watch?v=PU3U_aMbKwsarrow_forwardNorth Street Corporation manufactures two models of motorized go - carts, a standard and a deluxe model. The following activity and cost information has been compiled: Number of Number of Number of Product Setups Components Direct Labor Hours Standard 16 7 730 Deluxe 34 19 490 Overhead costs $16,000 $24,960 Number of setups and number of components are identified as activity - cost drivers for overhead. Assuming an activity - based costing system is used, what is the total amount of overhead cost assigned to the standard model? (Do not round interim calculations. Round the final answer to the nearest whole dollar.) O A. $17,600 O B. $11,840 OC. $29,120 O D. $20,480arrow_forward
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeExcel Applications for Accounting PrinciplesAccountingISBN:9781111581565Author:Gaylord N. SmithPublisher:Cengage Learning