Concept explainers
Future Value
Suppose you have a certain amount of money in a savings account that earns compound monthly interest, and you want to calculate the amount that you will have after a specific number of months. The formula, which is known as the future value formula, is
The terms in the formula are as follows:
- F is the future value of the account after the specified time period.
- P is the present value of the account.
- i is the monthly interest rate.
- t is the number of months.
Write a
Want to see the full answer?
Check out a sample textbook solutionChapter 6 Solutions
Starting Out with C++ from Control Structures to Objects (9th Edition)
Additional Engineering Textbook Solutions
C++ How to Program (10th Edition)
C Programming Language
Starting Out with C++: Early Objects
Introduction to Java Programming and Data Structures, Comprehensive Version (11th Edition)
Computer Science: An Overview (13th Edition) (What's New in Computer Science)
Digital Fundamentals (11th Edition)
- When you borrow money to buy a house, a car, or for some other purpose, you repay the loan by making periodic payments over a certain period of time. Of course, the lending company will charge interest on the loan. Every periodic payment consists of the interest on the loan and the payment toward the principal amount. To be specific, suppose that you borrow $1,000 at an interest rate of 7.2% per year and the payments are monthly. Suppose that your monthly payment is $25. Now, the interest is 7.2% per year and the payments are monthly, so the interest rate per month is 7.2/12 = 0.6%. The first months interest on $1,000 is 1000 0.006 = 6. Because the payment is $25 and the interest for the first month is $6, the payment toward the principal amount is 25 6 = 19. This means after making the first payment, the loan amount is 1,000 19 = 981. For the second payment, the interest is calculated on $981. So the interest for the second month is 981 0.006 = 5.886, that is, approximately $5.89. This implies that the payment toward the principal is 25 5.89 = 19.11 and the remaining balance after the second payment is 981 19.11 = 961.89. This process is repeated until the loan is paid. Write a program that accepts as input the loan amount, the interest rate per year, and the monthly payment. (Enter the interest rate as a percentage. For example, if the interest rate is 7.2% per year, then enter 7.2.) The program then outputs the number of months it would take to repay the loan. (Note that if the monthly payment is less than the first months interest, then after each payment, the loan amount will increase. In this case, the program must warn the borrower that the monthly payment is too low, and with this monthly payment, the loan amount could not be repaid.)arrow_forward(Civil eng.) Write an assignment statement to calculate the linear expansion in a steel beam as a function of temperature increase. The formula for linear expansion, l, is as follows: l=l0(1+(TfT0)) l0isthelengthofthebeamattemperatureT0.isthecoefficientoflinearexpansion.Tfisthefinaltemperatureofthebeam.arrow_forward(Statistics) This is the formula for the standard normal deviate, z, used in statistical applications: z=(X)/ X is a single value. refers to an average value. refers to a standard deviation. Using this formula, you need to write a program that calculates and displays the value of the standard normal deviate when X=85.3,=80,and=4. a. For this programming problem, how many outputs are required? b. How many inputs does this problem have? c. Determine a formula for converting input items into output items. d. Test the formula written for Exercise 7c, using the data given in the problem.arrow_forward
- Interest on a credit card’s unpaid balance is calculated using the average daily balance. Suppose that netBalance is the balance shown in the bill, payment is the payment made, d1 is the number of days in the billing cycle, and d2 is the number of days payment is made before billing cycle. Then, the average daily balance is: averageDailyBalance = (netBalance * d1 – payment * d2) / d1 If the interest rate per month is, say, 0.0152, then the interest on the unpaid balance is: interest = averageDailyBalance * 0.0152 Instructions Write a program that accepts as input netBalance, d1, payment, d2, and interest rate per month (interestRate). The program outputs the interest. Format your output to two decimal places. Input: 100 30 50 7 9.7 Output: 856.83 Test case 2: Input: 255.76 31 55 3 12.3 output: 3080.38arrow_forwardINDIVIDUAL WORK#8: Read a positive number v and calculate the minimum number of terms that need to be added in the sum § =1° +2² +3² + ...+ n° such that S>v.arrow_forwardThe quadratic formula is used to solve a very specific type of equation, called aquadratic equation. These equations are usually written in the following form:ax2 + bx + c = 0The Quadratic Formula x = ( -b ± √( b^2 - 4ac ) ) / ( 2a ) Where a, b, and c are constants with a ≠ 0. (If a = 0, the equation is a linear equation.)The discriminant is the part of the formula in the square root. If the value of the discriminant is zero then the equation has a single real root. If the value of thediscriminant is positive then the equation has two real roots. If the value of thediscriminant is negative, then the equation has two complex roots.Write a program that finds the roots of the quadratic equation using the Quadratic Formula. Write a function named discriminant in the file, Disc.py, to calculate and return the discriminant of the formula. Let the main function call the discriminant function and then calculate the solution(s) of the equation. Do not calculate the solutions in the discriminant…arrow_forward
- Periodic compounding The total accumulated value, including the principal sum P, is given by the formula: where: nt A = P(1 + 1) "² n A is the final amount Accumulated Value P is the original principal sum r is the nominal annual interest rate n is the compounding frequency t is the overall length of time the interest is applied (expressed using the same time units as r, usually years). Using the above formula write a program that will display the following table. Principal-Value | Times-Interest-Compunded | Annual-Int-Rate | Term | Accumulated-Value 1000 6.00% 10 3.20% 15 2000 3000 9.25% 10 2 ** 3 8 | You must use exponent operator to compute P Exponent Operator in Python is ** Examples m=3 n=2 p= m **n (https://en.wikipedia.org/wiki/Compound_interest) 1 2 4 base = 2 exp = 4 a = base ** exp print(a) 16 print("Solving the exponent, we get Solving the exponent, we get 9 ,p ) 1790.85 3219.89 7486.33arrow_forwardPython Code Needed Problem: A company wants a program that will calculate the weekly paycheck for an employee based on how many hours they worked. For this company, an employee earns $20 an hour for the first 40 hours that they work. The employee earns overtime, $30 an hour, for each hour they work above 40 hours. Example: If an employee works 60 hours in a week, they would earn $20/hr for the first 40 hours. Then they would earn $30/hr for the 20 hours they worked overtime. Therefore, they earned: ($20/hr * 40hrs) + ($30/hr * 20 hrs) = $800 + $600 = $1400 total. For this assignment, you must create pseudocode and a flowchart to design a program that will calculate an employee’s weekly paycheck. Write pseudocode to design a programming solution by outlining a series of steps and using appropriate indentation and keywords. As you write your pseudocode, be sure to consider the following: What input does the computer need? What steps does the program need to follow to process the input?…arrow_forwardBackground: Game Rules The rules to the (dice) game of Pig: You will need 2 dice. To Play: a. The players each take turns rolling two die. b. A player scores the sum of the two dice thrown (unless the roll contains a 1): If a single number 1 is thrown on either die, the score for that whole turn is lost (referred to as “Pigged Out”). A 1 on both dice is scored as 25. c. During a single turn, a player may roll the dice as many times as they desire. The score for a single turn is the sum of the individual scores for each dice roll. d. The first player to reach the goal score wins unless a player scores higher subsequently in the same round. Therefore, everyone in the game must have the same number of turns. Execution and User Input This program is quite interactive with the user(s) and will take in the following information; please review the sample input / output sessions for details; we describe them again here emphasizing input. The program will prompt for the number of…arrow_forward
- METHODOLOGY A bookstore owner wants you to write a program that calculates the gross pay of an employee. The input to the program is the number of hours the employee works in one week and the employee’s hourly pay rate. The program is to calculate the employee’s gross pay including the possibility of overtime pay. Regular pay is the number of hours the employee worked (up to 40 hours) times the hourly rate. The program is to compute an overtime pay if the employee worked more than 40 hours. All hours beyond 40 should be multiplied to 1.5 for the OT differential pay The program should output the worker’s regular pay, overtime time, and the gross pay (sum of the regular pay and overtime pay). Create an IPO and flowchartarrow_forwardIntroduction Some number of teams are participating in a race. You are not told how many teams are participating but you do know that: Each team has a name, which is one of the uppercase letters A-Z. No two teams have the same name, so there are a maximum number of 26 teams. Each team has the same number of members. No two runners cross the finish line at the same time – i.e. there are no ties. At the end of the race we can write the results as a string of characters indicating the order in which runners crossed the finish line. For example: ZZAZAA We can see there were two teams: A and Z. Team A’s runners finished in 3rd, 5th and 6th place. Team Z’s runners finished in 1st, 2nd and 4th place. Scoring the race Each runner is assigned a score equal to their finishing place. In the example above team Z’s runners achieved scores of 1, 2 and 4. Team A’s runners scores were 3, 5, and 6 respectively. The team’s score is the sum of the members score divided by the number of people on…arrow_forward10 - In an examination, 500 students appeared. Out of these students, 38 % got A+ grade, 45 % got B+ and the remaining just passed. Assuming that no student failed, find the number of students who got A+, B+ and the number of students who just passed.(Python code)arrow_forward
- C++ Programming: From Problem Analysis to Program...Computer ScienceISBN:9781337102087Author:D. S. MalikPublisher:Cengage LearningC++ for Engineers and ScientistsComputer ScienceISBN:9781133187844Author:Bronson, Gary J.Publisher:Course Technology Ptr